Browse
Search
2012-133 Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-133 Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2013 8:40:06 AM
Creation date
7/17/2013 8:33:26 AM
Metadata
Fields
Template:
BOCC
Date
9/6/2012
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5i
Document Relationships
Agenda - 09-06-2012 - 5i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 09-06-2012 - Regular Mtg.
Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2B '2,a. <br /> Hobbs Upchurch Associates <br /> engineering I planning i surveying <br /> August 3,2012 <br /> Mr.Craig Benedict <br /> Orange County Planning&Inspection <br /> 131 W.Margaret Lane <br /> Hillsborough,NC 27278 <br /> RE: Efland Sewer System <br /> Re-Routing Sewer Discharge to Gravelly Hill <br /> Engineering Design Services Proposal <br /> Dear Mr.Benedict: <br /> Per our previous discussions, and in accordance with our preliminary engineering report for the <br /> Buckhorn-Mebane EDD project, HUA offers to provide engineering design services for the <br /> above referenced project. Our design services shall adhere to the conditions, expectations, and <br /> level of service as noted in our original contract with Orange County dated November 4,2010. <br /> Following is a summary of the proposed costs: <br /> Surveying $18,000.00 <br /> Engineering Design $133,600.00 <br /> Please find attached a copy of the detailed estimate and layout map for the proposed project. <br /> Upon execution of an amendment to our contract to complete this work, we will schedule a <br /> meeting to review the previously completed report, all the latest Efland design information, and <br /> develop a detailed work schedule. <br /> If you should require additional information,or wish to discuss the project further,please do not <br /> hesitate to contact this office. <br /> Sincerely, l 11 ��� <br /> HOBBS,UPCHUR &ASSOCl� �i'1Zz,�� <br /> 20•.o�ESSlp y� <br /> y <br /> SEAL <br /> Bill Lester,Jr., P.E 17651 <br /> l ` <br /> 7:010.692,6016 R 910.892.7342 1 300 SW BROAD STREET SOUTHERN PINES.NC 28397 WWW,HOBBSUPCHURCH.COM <br /> SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.