Browse
Search
2013-220 Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-220 Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 9:34:22 AM
Creation date
7/17/2013 8:25:51 AM
Metadata
Fields
Template:
BOCC
Date
9/18/2012
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
Document Relationships
Agenda - 09-18-2012 - 5h
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 09-18-2012 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and assist the ENGINEER in serving as OWNER'S liaison with CONTRACTOR when <br /> CONTRACTOR'S operations affect OWNER'S onsite operations. <br /> b. Assist in obtaining from OWNER additional details or information, when required for proper <br /> execution of the Work. <br /> 4. Shop Drawings and Samples: <br /> a. Record date of receipt of Shop Drawings and samples. <br /> b. Receive samples which are furnished at the site by CONTRACTOR, and notify ENGINEER of <br /> availability of samples for examination. <br /> C. Advise ENGINEER and CONTRACTOR of the commencement of any Work requiring a Shop <br /> Drawing or sample of the submittal of the submittal has not been approved by ENGINEER. <br /> 5. Review of Work,Rejection of Defective Work,Inspections and Tests <br /> a. Conduct on-site observations of the Work in progress to assist ENGINEER in determining if the <br /> Work is in general proceeding in accordance with the Contract Documents. <br /> b. Report to ENGINEER whenever RPR believes that any Work is unsatisfactory,faulty or defective or <br /> does not conform to the Contract Documents, or has been damaged, or does not meet the <br /> requirements of any inspection, test or approval required to be made; and advise ENGINEER of <br /> Work that RPR believes should be corrected or rejected or should be uncovered for observation,or <br /> requires special testing,inspection or approval. <br /> C. Verify that tests, equipment and systems startups and operating and maintenance training are <br /> conducted in the presence of appropriate personnel, and the CONTRACTOR maintains adequate <br /> records thereof, and observe,record and report to ENGINEER appropriate details relative to the test <br /> procedures and startups. <br /> d. Accompany visiting inspectors representing public or other agencies having jurisdiction over the <br /> Project,record the results of these inspections and report to the ENGINEER <br /> 6. Interpretation of Contract Documents: Report to ENGINEER when clarifications and interpretations of <br /> the Contract Documents are needed and transmit to CONTRACTOR clarifications and interpretations as <br /> issued by ENGINEER. <br /> 7. Modifications: Consider and evaluate CONTRACTOR'S suggestions for modifications in Drawings or <br /> Specifications and report with RPR's recommendations to ENGINEER. Transmit to CONTRACTOR <br /> decisions as issued by ENGINEER. <br /> 8. Records: <br /> a. Maintain at the job site orderly files for correspondence,reports of job conferences,Shop Drawings <br /> and samples,reproductions of original Contract Documents including all Work Directive Changes, <br /> Addenda,Change Orders,Field Orders, additional Drawings issued subsequent to the execution of <br /> the Contract, ENGINEERS clarification and interpretations of the Contract Documents, progress <br /> reports,and other Project related documents. <br /> b. Keep a diary or log book,recording CONTRACTOR hours on the job site,weather conditions,data <br /> relative to questions of Work Directive Changes, Change Orders or changed conditions,list of job <br /> site visitors, daily activities, decisions, observations in general, and specific observations in more <br /> detail as in the case ofobserving test procedures;and send copies to ENGINEER. <br /> C. Record names,addresses and telephone numbers of all CONTRACTORS,subcontractors and major <br /> suppliers of materials and equipment. <br /> 9. Reports: <br /> a. Furnish ENGINEER periodic reports as required of progress of the Work and of CONTRACTOR'S <br /> compliance with the progress schedule and schedule of Shop Drawing and sample submittals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.