Browse
Search
2013-220 Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-220 Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 9:34:22 AM
Creation date
7/17/2013 8:25:51 AM
Metadata
Fields
Template:
BOCC
Date
9/18/2012
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
Document Relationships
Agenda - 09-18-2012 - 5h
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 09-18-2012 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buckhorn- Mebane EDD-Phase 2 Water& Sewer Improvements <br /> Orange County, NC <br /> Manhour Estimate for Construction Management& Inspection <br /> Lines S1 &S2 (19 Week Construction Time) <br /> Hours Rate Fee <br /> Engineer 152 130 $19,760.00 <br /> Construction Manager 380 80 $30,400.00 <br /> Designer 40 90 $3,600.00 <br /> Administrator 401 60 $2,400.00 <br /> Subtotal: 612 360 $56,160.00 <br /> Lines W1,W2, &W3 (19 Week Construction Time) <br /> Hours Rate Fee <br /> Engineer 152 130 $19,760.00 <br /> Construction Manager 380 80 $30,400.00 <br /> Designer 40 90 $3,600.00 <br /> Administrator 1 401 60 $2,400.00 <br /> Subtotal: 612 360 $56,160.00 <br /> Line S3 (22 Week Construction Time) <br /> Hours Rate Fee <br /> Engineer 176 130 $22,880.00 <br /> Construction Manager 440 80 $35,200.00 <br /> Designer 60 90 $5,400.00 <br /> Administrator 601 60 $3,600.00 <br /> Subtotal: 7361 360 $67,080.00 <br /> PS& FM (12 Week Construction Time) <br /> Hours Rate Fee <br /> Engineer 96 130 $12,480.00 <br /> Construction Manager 240 80 $19,200.00 <br /> Designer 40 90 $3,600.00 <br /> Administrator 401 60 $2,400.00 <br /> Subtotal: 1 4161 360 $37,680.00 <br /> Total: $217,080.00 <br /> Total if all sections are constructed concurrently $193,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.