Browse
Search
Agenda - 04-01-1997 - 9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 04-01-1997
>
Agenda - 04-01-1997 - 9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2013 2:34:54 PM
Creation date
7/12/2013 2:34:51 PM
Metadata
Fields
Template:
BOCC
Date
4/1/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9d
Document Relationships
1997 S Planning - Corps of Engineers Drainage Basin Study - Funding Agreement with Town of Chapel Hill
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1997
Minutes - 19970401
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> s <br /> 1 <br /> Y <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date:April 1. 1997 <br /> Action Agenda <br /> Item <br /> SUBJECT: Corps of Engineers Drainage Basin Study - <br /> Funding Agreement with Town of Chapel Hill <br /> DEPARTMENT: Planning PUBLIC HEARING: _Yes_X_No <br /> BUDGET AMENDMENT REQUIRED: —X—Yes No <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> Program Summary Mary Willis, Extension 2583 <br /> Scope of Services <br /> Map of Study Area TELEPHONE NUMBERS: <br /> Correspondence Hillsborough- 732-8181 <br /> Draft Agreement Between Corps and Chapel Hill Durham - 688-7331 <br /> Draft Agreement Between Orange Co. and Chapel Hill Mebane - 227-2031 <br /> Chapel Hill - 967-9251 <br /> PURPOSE: To authorize execution of an agreement between Orange County and Chapel Hill <br /> which would commit Orange County to contribute two installments of$6,250 to a <br /> drainage basin study to be conducted by the Army Corps of Engineers for Booker, <br /> Bolin and Morgan Creeks <br /> BACKGROUND: Following the rains which occurs in August of 1995,the Chapel Hill Town <br /> Council received a report from the Town Manager, discussing the resultant <br /> flooding and responding to several petitions from residents whose property <br /> was flooded. The report included the follow-up tasks listed below: <br /> 1. Implement any necessary changes in personnel equipment, or <br /> procedures for future emergency response efforts. <br /> 2. Investigate of U.S. Corps of Engineers Planning Assistance To <br /> States Program and report back to the Council with findings <br /> and a suggested process for including neighboring jurisdictions <br /> and the University. <br />
The URL can be used to link to this page
Your browser does not support the video tag.