Browse
Search
Agenda - 04-01-1997 - 8j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 04-01-1997
>
Agenda - 04-01-1997 - 8j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2013 11:33:49 AM
Creation date
7/12/2013 11:33:46 AM
Metadata
Fields
Template:
BOCC
Date
4/1/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8j
Document Relationships
Minutes - 19970401
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
RES-1997-016 Resolution of Approval Amberidge Subdivision Preliminary Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: April 1. 1997 <br /> Action Agenda <br /> Item #_A=j* _ <br /> SUBJECT: Amberidge Subdivision-Preliminary Plan <br /> ACTION BY: May 15, 1997 <br /> DEPARTMENT: Planning& Inspections PUBLIC HEARING: Yes_x—No <br /> BUDGET AMENDMENT REQUIRED: Yes_x—No <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> Eddie Kirk <br /> Resolution of Approval Extension 2582 <br /> Application <br /> Vicinity Map TELEPHONE NUMBERS: <br /> Fiscal Impact Analysis Hillsborough 732-8181 <br /> Preliminary Plan Durham 688-7331 <br /> Draft 3/5/97 Planning Board Minutes Mebane 227-2031 <br /> Chapel Hill - 967-9251 <br /> PURPOSE: Consideration of the Preliminary Plan for Amberidge Subdivision. <br /> BACKGROUND: The property is located between University Station Road and the Chapel Hill Spur <br /> of the Southern Railroad in northern Chapel Hill Township. Ten(10)residential <br /> lots are proposed on a 10.4 acre tract. The current zoning is Rural Residential and <br /> Lower Eno Protected Watershed. <br /> The land drains to the northeast corner where a small intermittent stream from a <br /> nearby pond flows under the railroad. A stream buffer is provided along the <br /> stream; a 50-foot land use buffer is required adjacent to the railroad right-of-way. <br /> The site is almost entirely wooded except for a small garden area and an overhead <br /> power line on the western portion of the tract. The trees on site are mixed pines <br /> and hardwoods approximately 25 years old, which indicates that the land was <br /> farmed in the recent past. <br />
The URL can be used to link to this page
Your browser does not support the video tag.