Browse
Search
Agenda - 02-24-1997 - C3b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 02-24-1997
>
Agenda - 02-24-1997 - C3b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 11:57:34 AM
Creation date
7/11/2013 11:57:26 AM
Metadata
Fields
Template:
BOCC
Date
2/24/1997
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-3b
Document Relationships
Minutes - 19970224
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
PH ORD-1997-003 Zoning Ordinance Text Amendments - Golf Course Standards
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 1990-1999\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br /> 2111197 Final Draft Page 19 <br /> groundwater, and sediment on site. The monitoring program shall include the <br /> following: <br /> a. Base Line and Construction Monitoring. <br /> (1) Base line monitoring shall be conducted for the three consecutive <br /> months immediately prior to commencement of construction of any <br /> component of the golf course development; <br /> (2) A minimum of three (3) surface water sample stations will be <br /> established. A minimum of three (3) ground water wells will be <br /> installed. A minimum of one (1) sediment sample station will be <br /> established; and <br /> (3) Parameters for sampling shall be as provided in 8.8.7.6c below. <br /> (4) During construction of the golf course, obtain quarterly samples from <br /> the same stations required in 8.8.7.6a(2) above; <br /> b. Operations Monitoring <br /> (1) The same stations required in 8.8.7.6a(2) above shall be used to <br /> monitor operation of the golf course; <br /> (2) A minimum of three(3) samples will be taken at each of the surface <br /> water sample locations, two(2) groundwater samples at each of the <br /> ground water sample locations, and one (1) sediment sample will be <br /> taken; <br /> (3) Monitoring will continue on a quarterly schedule for a period of three <br /> years from the start of golf course operations. After three years, <br /> monitoring may be reduced to two times per year for surface and <br /> groundwater. The three-year period may be extended if pollutant levels <br /> exceed thresholds established by U.S. Environmental Protection <br /> Agency health advisory limits (HAL) and/or standards set by the North <br /> Carolina Department of Environment,Health and Natural Resources; <br /> and <br /> (4) Parameters for sampling shall be as provided in 8.8.7.6c below. <br /> C. Parameters for Sample Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.