Browse
Search
2013-219 AMS - L A Downey Storm Water repairs Whitted Building $30,327
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-219 AMS - L A Downey Storm Water repairs Whitted Building $30,327
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2013 3:38:42 PM
Creation date
7/9/2013 3:38:07 PM
Metadata
Fields
Template:
BOCC
Date
7/8/2013
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
R 2013-219 AMS - L A Downey for Storm Water Repairs at Whitted Building $30,327
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER,REPAIRS TO WHETTED BUILDING <br /> HILLSBOROUGH,NC 03/26/13 <br /> 3.17 PROTECTION <br /> A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep <br /> free of trash and debris. <br /> B. Repair and reestablish grades to specified tolerances where completed or partially completed <br /> surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent <br /> construction operations or weather conditions. <br /> I Scarify or remove and replace soil material to depth as directed by Architect; reshape and <br /> recompact. <br /> C. Where settling occurs before Project correction period elapses, remove finished surfacing, <br /> backfill with additional soil material,compact,and reconstruct surfacing. <br /> 1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, <br /> and eliminate evidence of restoration to greatest extent possible. <br /> 3.18 DISPOSAL OF SURPLUS AND WASTE MATERIALS <br /> A. Disposal: Remove surplus satisfactory soil and waste material, including unsatisfactory soil, <br /> trash, and debris, and legally dispose of it off Owner's property. <br /> END OF SECTION 02300 <br /> EARTHWORK 02300- 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.