Orange County NC Website
STORMWATER,REPAIRS TO WHETTED BUILDING <br /> HILLSBOROUGH,NC 03/26/13 <br /> 3.17 PROTECTION <br /> A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep <br /> free of trash and debris. <br /> B. Repair and reestablish grades to specified tolerances where completed or partially completed <br /> surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent <br /> construction operations or weather conditions. <br /> I Scarify or remove and replace soil material to depth as directed by Architect; reshape and <br /> recompact. <br /> C. Where settling occurs before Project correction period elapses, remove finished surfacing, <br /> backfill with additional soil material,compact,and reconstruct surfacing. <br /> 1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, <br /> and eliminate evidence of restoration to greatest extent possible. <br /> 3.18 DISPOSAL OF SURPLUS AND WASTE MATERIALS <br /> A. Disposal: Remove surplus satisfactory soil and waste material, including unsatisfactory soil, <br /> trash, and debris, and legally dispose of it off Owner's property. <br /> END OF SECTION 02300 <br /> EARTHWORK 02300- 8 <br />