Browse
Search
2013-219 AMS - L A Downey Storm Water repairs Whitted Building $30,327
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-219 AMS - L A Downey Storm Water repairs Whitted Building $30,327
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2013 3:38:42 PM
Creation date
7/9/2013 3:38:07 PM
Metadata
Fields
Template:
BOCC
Date
7/8/2013
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
R 2013-219 AMS - L A Downey for Storm Water Repairs at Whitted Building $30,327
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER REPAIRS TO WHITTED BUILDING <br /> HILLSBOROUGH,NC 03/26/13 <br /> H. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical <br /> and electrical appurtenances, or other man-made stationary features constructed above or below <br /> the ground surface. <br /> I. Subbase Course: Course placed between the subgrade and base course for hot-mix asphalt <br /> pavement, or course placed between the subgrade and a cement concrete pavement or a cement <br /> concrete or hot-mix asphalt walk. <br /> J. Subgrade: Surface or elevation remaining after completing excavation,or top surface of a fill or <br /> backfill immediately below subbase,drainage fill, or topsoil materials. <br /> K. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground <br /> services within buildings. <br /> 1.4 PROJECT CONDITIONS <br /> A. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others <br /> unless permitted in writing by Architect and then only after arranging to provide temporary <br /> utility services according to requirements indicated. <br /> 1. Notify Architect not less than two days in advance of proposed utility interruptions. <br /> 2. Do not proceed with utility interruptions without Architect's written permission. <br /> 3. Contact utility-locator service for area where Project is located before excavating. <br /> B. Demolish and completely remove from site existing underground utilities indicated to be <br /> removed. Coordinate with utility companies to shut off services if lines are active. <br /> PART 2-PRODUCTS <br /> 2.1 SOIL MATERIALS <br /> A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not <br /> available from excavations. <br /> B. Satisfactory Soils: ASTM D 2487 Soil Classification Groups GW, GP, GM, SW, SP, GC, SC, <br /> ML, CL, CH and SM, or a combination of these groups; free of rock or gravel larger than 3 <br /> inches (75 mm) in any dimension, debris, waste, frozen materials, vegetation, and other <br /> deleterious matter. <br /> C. Unsatisfactory Soils: Soil Classification Group OL, MH, OH, and PT according to <br /> ASTM D 2487,or a combination of these groups. <br /> 1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of <br /> optimum moisture content at time of compaction. <br /> D. Subbase Material: Naturally or artificially graded mixture of natural or crushed gravel, crushed <br /> stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch <br /> (37.5-mm)sieve and not more than 12 percent passing a No. 200(0.075-mm)sieve. <br /> EARTHWORK 02300-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.