Browse
Search
2013-219 AMS - L A Downey Storm Water repairs Whitted Building $30,327
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-219 AMS - L A Downey Storm Water repairs Whitted Building $30,327
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2013 3:38:42 PM
Creation date
7/9/2013 3:38:07 PM
Metadata
Fields
Template:
BOCC
Date
7/8/2013
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
R 2013-219 AMS - L A Downey for Storm Water Repairs at Whitted Building $30,327
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER REPAIRS TO WHITTED BUILDING <br /> HILLSBOROUGH,NC 03/26/13 <br /> SECTION 02300 -EARTHWORK <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Division 1 Specification Sections,apply to this Section. <br /> 1.2 SUMMARY <br /> A. This Section includes the following: <br /> 1. Preparing subgrades for slabs-on-grade,walks,pavements, and lawns and grasses. <br /> 2. Excavating and backfilling for buildings and structures. <br /> 3. Drainage course for slabs-on-grade. <br /> 4. Subbase course for concrete walks and pavements. <br /> 1.3 DEFINITIONS <br /> A. Backfill: Soil material or controlled low-strength material used to fill an excavation. <br /> 1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to <br /> support sides of pipe. <br /> 2. Final Backfill: Backfill placed over initial backfill to fill a trench. <br /> B. Base Course: Course placed between the subbase course and hot-mix asphalt paving. <br /> C. Bedding Course: Course placed over the excavated subgrade in a trench before laying pipe. <br /> D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill. <br /> E. Drainage Course: Course supporting the slab-on-grade that also minimizes upward capillary <br /> flow of pore water. <br /> F. Excavation: Removal of material encountered above subgrade elevations and to lines and <br /> dimensions indicated. <br /> 1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond <br /> indicated lines and dimensions as directed by Architect. Authorized additional <br /> excavation and replacement material will be paid for according to Contract provisions for <br /> unit prices. <br /> 2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated <br /> lines and dimensions without direction by Architect. Unauthorized excavation, as well as <br /> i remedial work directed by Architect, shall be without additional compensation. <br /> G. Fill: Soil materials used to raise existing grades. <br /> EARTHWORK 02300- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.