Orange County NC Website
g <br /> [Departmental Use Only] <br /> TITLE Whitted Store Front Doors <br /> FY 2013-2014 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$100,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement'), made as of the 24th day of <br /> June, 2013, by and between Ken Moser Company, (hereinafter called the "Contractor"), and Orange County, a <br /> body corporate and politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "Owner"). <br /> WITNES SETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work required by this <br /> Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the Contractor and <br /> Owner and in accordance with the following enumerated documents, which are attached hereto and made a part <br /> hereof as if fully contained herein: .ISW 6�_(L -5 <br /> a. Construction Drawings prepared by Orange County Asset Management Services & Attached to bid <br /> #1665 dated 12/14/2012 (Sheet set 1 of 3, 2 of 3, and 3 of 3 attached Bid #1665 dated December 14, <br /> 2012.) <br /> b. Written specifications prepared by the project engineer. <br /> c. Orange County bid proposal dated December 14, 2012 which fully describes the work to be <br /> performed, such work hereinafter called the"Work". <br /> d. Other documents as follows: Bid submission received from Ken Moser Company dated December <br /> 14, 2013.. <br /> 2. TERM AND SCHEDULING <br /> a. The Contractor agrees to commence work on the date of the executed original of this Agreement <br /> and agrees to complete fully all Work included by August 15, 2013. Vim) 6(-2-0((3 <br /> b. Time is of the essence with respect to all dates specified in the Contract Documents as Completion <br /> Dates. <br /> c. The Contractor shall perform the Work in the time, manner and form required by the Contract <br /> Documents and as stipulated in a written Notice-to-Proceed to be executed by the Contractor and <br /> Owner. <br /> d. It is expressly understood that the Owner will employ other contractors to perform work as a part <br /> of the Project whose work will be performed simultaneously and sequentially with the performance <br /> of the Work by the Contractor. It shall be necessary for the Contractor to coordinate its activities <br /> with such other contractors, particularly with respect to access to work areas, storage of materials <br /> and other common facilities. <br /> e. Should the Owner determine that the Contractor is behind schedule, it may require the Contractor <br /> to expedite and accelerate its efforts, including providing additional resources and working <br /> Revised October 2011 1 <br />