Orange County NC Website
p 9131 Anson Way,Suite 204 <br /> Raleigh,North Carolina 27615 <br /> Office:919-573-6400 <br /> Toll-tree:800-590-MBAJ <br /> Fax:919-573-6495 <br /> April 1,2013 <br /> Mr.Jeff Thompson <br /> Orange County Director of Asset Management Services <br /> 200 South Cameron Street <br /> P O Box 8181 <br /> Hillsborough,NC 27278 <br /> RE: Northern Human Services Center Renovation <br /> COMM.NO.: FILE NO.: A-1.0 <br /> Dear Jeff: <br /> We are excited to have been selected by Orange County for the desiin of renovations at the <br /> Northern Hunan Services Center project. We look forward to developing a strong working <br /> relationship with you through this project As requested,below is our proposal for professional <br /> services. i <br /> Project Scope i <br /> MBAJ Architecture will provide architectural and engineering design services for the Northern <br /> Hutnaa Services Center Renovation. The scope of services will include Programming,Design and <br /> Construction Observation for upgrades and renovation to the existing Cedar Grove facility.The <br /> exact scope of the renovations will be determined during the programming phase utilizing a round <br /> table format to gather input from the project committee.The project scope will include a <br /> recognition of the cultural significance of this site.The exact nature of this recognition will be an <br /> integral part of the programming process.The final proposed scope of the project will be balanced <br /> against the funding available for the project. <br /> MBAJ will engage independent engineering consultants to provide Structural evaluation for the <br /> proposed demolition,along with Civil/Landscape,Plumbing,Mechanical,Electrical and <br /> Technology design for the proposed facility renovation. Design services shall be provided in the <br /> traditional phases of Programming,Schematic Design,Design Development,Construction <br /> Documents,Bidding and Construction Administration. Based upcn out pre-contract discussions, <br /> our proposed fee does not include hazardous material abatement dfsign,storm water BMP design, i <br /> fire protection design,surveying,geothermal conductivity test wells or geotechnical investigation <br /> for the project <br /> The total budget for the facility including design,construction,and contingency is$2 trillion. The <br /> fees proposed are based upon the scope of work as we understand it at this time and the project <br /> durations outlined in the attached schedule. <br /> KXPROSPECT-CUENT1Civic-GovernmentaMiorth Carolina\County\Orange\f'roposals120130401 jft Revised Fee <br /> Proposal.dom <br />