Orange County NC Website
6. <br /> Memorandum <br /> rumble strips and warning signs would be to construct concrete islands in the intersection <br /> to channelize vehicular movements or to contact the Highway Patrol and request that they <br /> provide more enforcement in this area. I agreed to write a letter to the Highway Patrol <br /> and make this request. NCDOT will continue to monitor the intersection and will also <br /> review the accident history of this intersection for the past three years. <br /> 3) OTHER ISSUES: <br /> Another intersection that may be impacted by the restriction of truck traffic from using <br /> Churton Street would be Faucette Mill\US 70 BYP. We requested that NCDOT study <br /> this intersection, especially after the improvements are made to NC 86\US 70 BYP and <br /> the truck restriction is placed on Churton Street. <br /> Dr. Gordon requested clarification on the process to request TIP and Non-TIP projects. <br /> Dr. Gilbert responded that Orange County has a good process and that the best times to <br /> meet with him to discuss TIP projects is in January after the MPO has adopted it's <br /> Regional Priority List of projects. Dr. Gilbert also mentioned that he would meet with <br /> Orange County as often as we wished. <br /> Dr. Gordon requested clarification on the different funding sources available for road <br /> improvements. Dr. Gilbert and NCDOT staff mentioned the following. <br /> Small Urban Funds-this is to fund projects within 1 mile of a <br /> municipality and cannot exceed$ 150,000 per project per year; <br /> Spot Safety Funds-these funds are projected monthly and are for projects <br /> of less than$ 75,000; <br /> Discretionary Funds-these are allocated to the legislature for their use, <br /> can be used for projects that cost under$ 100,000; and <br /> State Transportation Improvement Program (STIP)-for funding projects <br /> over$ 350,000. <br /> NCDOT staff also mentioned that these funds can be used in combination with each other <br /> to fund those projects that are over the individual funding limitations but are not STIP <br /> type projects (i.e., between$ 150,000 and$ 350,000). <br /> 3 <br />