Orange County NC Website
S <br /> 1.7 Once the inventory recording and analysis n+ape are complew, then the site will Fw.reviewed lured <br /> upon the program identified in to initial start-up meeting and the input received from the putdie. <br /> Two lend use owdles for the sits will be prepared indicating potential trials, environmental <br /> ,Dune dottai areas, picnic areas,athletic use areas, roadway corridors, support facilities,parldng, <br /> playt{ound plaasotents,utility corridors and pedestrian aecxeae rctn0es. <br /> 1.8 Upon the completion of the land mr.attunes,Wcxgpert will once again meet with the County to <br /> review the progress of the project to date. Ile land use skidies will be reviewed and a final <br /> concept will be deterrminad alW wilt a fixed program. <br /> 1.9 A second public.input."st*m will be held to review the land use studies and obtain further <br /> information from due public. This will be an evening meeting held at a convenient public location. <br /> 1.10 Based upon file input received from the County and the public,a final master plan will be <br /> prepared for the (land-Cheeks School Park Site. This document will be a detailed map indicating <br /> all the Mal approved Improvemems for the site. <br /> 1.11 A phasing plan will be prepared to outline the sequence of park development and identify these <br /> facilities to be included in the Phase I construction. <br /> 1.12 An estimate of probable eonstmedon costs will be elwred to identify the total cost of the project <br /> in 1997 dollars.This esdmas will also be prapwred to identify any phasing of tlse project as agreed <br /> upon by the County through the planning process. <br /> 1.13 The Exeeudve Summary Report will be completed summarizing site analysis, master planning, <br /> public involvement, phasing std coat estunaaes. <br /> 1.14 A final review of the project will be done with the County .The final master plan and PBCtx.-unive <br /> Summary Report will be reviewed. <br /> 1.15 A final presentation will be given before the County COMMWM and to the School Board to <br /> inform them of the final master plan. These will be separate mtxtingtt. <br /> 1.16 'Twenty Copies of to Zxeeudve Summary RCpurt, alung with one color ronderinj of the aoam r <br /> plan,will be provided to tie County. <br /> 2.1 The following sm "CM are Wt included In aervic es as uutilued iu Section I.Tbey shall be prDvidod <br /> if authorized or confirmed In writing by tit:County , and they shall be paid for by the County as <br /> provided in to AS=mem and/or as surcmi Ummu dw County sad tie Conenitant. <br /> 2.1.1 Providing services na Wdny, fiunu aigniflumt changes in die etncnt of to project as defloed <br /> in this Agreement and the start-up meeting. <br /> 2.1.2 Providagg services to inveadgaw eusting conditions or faeilldes,or to make measured <br /> dmwtnge d wwt, at to verify the accuracy of drawiaas or odic 14czantson fiiraisW by <br /> tba County. <br /> 2.1.3 Providing serviees to comteeaon with alternative design for oast est9tttating purposes. <br /> 2.1.4 Mating revision in drawings or other documents when such revidons are itto0tt"ent <br /> With wrium appeovals or instructions previously given. <br /> 2.1.5 providing sarviose made awry by tine failure of performnres of the CAundy. <br />