Orange County NC Website
4 <br /> County. (Bim Mapping to be provided by the County) <br /> 1.2 7114 iuveabory and analysis portion of the project will occur met. This phase of the work will <br /> require that field information be gatbtred from the site. The information will include data from the <br /> following areas: <br /> 1.2.1 Traffic information about existing and proposed roadway irnprovemelft within pod <br /> adjacent to the site will be reviewed.This will include major and minor aces <br /> routes to the site and the deiermicsttion of any problem areas for pedestrian and veWoular <br /> access. <br /> 1.2.2 Any easement information will be determined under this study phase as well as the impact <br /> Ow easetnents will have an the propnwA site. <br /> 1.2.3 The identification of bikeways and ptMnW greemvay corridors that may be pertinent to <br /> the project will be identified. <br /> 1.2.4 The existing utilities including water, sanitary sewer and electric service will be <br /> inventoried. <br /> 1.2.5 The existing soils for the site will be evaluated through the use of County Soils Maps. <br /> 1.2.6 The lowland area adjacent to std within the site will be evaluated along with other <br /> potential areas of suspected weduft. <br /> 1.2.7 The dopes will be reviewed and analyzed to determine the brat development of Itte site. <br /> This will include the review of the slopes in f+ar dif Brent categories including 0.6%,5- <br /> 10%, 10% or grater slopes. <br /> 1.2.8 The site and adjacent areas will also be inventoried in both slides and photos t refie.retuoe <br /> during meetings. A video record of the existing din conditions will also be obtained during <br /> the field gadtering operation. <br /> 1.3 Based upon the ioormation obtained in efts fi sid,two composite Analysis maps will be propluaxl <br /> indicating the information found in the field. These maps will be as fellows: <br /> • Cultural Elements: Circulation, Utilities,LOW Use,Easements, Etc.. <br /> • Natural Elements: Soils,Slopes,Dminap,Vegetation, Etc.. <br /> 1.4 An Exec ove Summary Report will be Initiated documaadng ekes key Cu aliuga from the site <br /> analysis. <br /> Teak II NW"Plmt <br /> 1.5 A V"-.input session wW be held to obtain inibmadoo that the public Peals is pertinent to the <br /> —V M drrdopment. This h9dal public WpA moduu will be a Saturday session at Etlaad-Chccb <br /> Mummy Scholl or the Community Center.This meeting will be a working session when the <br /> public cult Nave to opportudly to iulara:i with 1114 Coasull MA and participate is the aafual design <br /> of tits park.This will be done in a team f tzWon wilt k q Consultant memben working in small <br /> groups with the public. Tim public wM review the I= fbdiagp from&a sibs analysis. The final <br /> product will be a series of design ideas that will be taken to the County for review, commwt and <br /> AWIuval. <br /> 1.6 A review meeting witb to County will rhos be bald so review the project process to date. The situ <br /> analysis and design ideas Piero the public session wW be presetaed along with further findings of <br /> the Co=Wbnt. <br />