Browse
Search
Agenda - 02-03-1997 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 02-03-1997
>
Agenda - 02-03-1997 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2013 11:41:34 AM
Creation date
6/26/2013 11:41:23 AM
Metadata
Fields
Template:
BOCC
Date
2/3/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 19970203
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br /> 12119196 Final Draft 15 <br /> (4) A monitoring and maintenance plan to measure success of the <br /> mitigation based on stated objectives. Include a list of parties <br /> responsible for monitoring and maintenance, a schedule for each, <br /> and how results will be reported at least twice a year to the Planning <br /> and Inspections Department; <br /> (5) A contingency plan including how the site will be protected from <br /> impacts by human and unwanted animal intrusion, alternate plant <br /> species and construction methods that could be used in the event <br /> adjustments or substitutions are needed until the mitigation area is <br /> established;and <br /> (6) A financial guarantee is required for the total cost of the mitigation <br /> project. Once the installation is complete,thirty percent(30%)of the <br /> amount of the bond,letter of credit,or escrow will be held for twelve <br /> (12)months or until the site is established,whichever is greater. <br /> 8.8.7.4 Construction <br /> a. Drainage <br /> (1) All drainage structures shall be installed and maintained according to <br /> the approved Stormwater Management Plan. <br /> (2) Golf courses that include retention/detention ponds shall comply <br /> with the requirements in Article 6.23.4, Operation and Maintenance <br /> of Structural Best Management Practices. <br /> b. Grading and Erosion Control <br /> (1) Plans for grading'and erosion control must comply with standards <br /> contained in the Orange County Erosion and Sediment Control <br /> Ordinance and Manual; <br /> (2) Whenever practical, construction shall be phased to minimize <br /> disturbance and sedimentation; <br /> (3) sediment control measures must be properly installed to filter <br /> sediment from runoff during construction and shall be maintained <br /> until grading is complete and a permanent vegetative cover has been <br /> established and all slopes stabilized;and <br />
The URL can be used to link to this page
Your browser does not support the video tag.