Browse
Search
2013-173 SW - HDR Engineering Inc of the Carolinas for General Engineering Purpose for Solid Waste $Varies
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-173 SW - HDR Engineering Inc of the Carolinas for General Engineering Purpose for Solid Waste $Varies
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2013 3:11:54 PM
Creation date
6/25/2013 3:11:52 PM
Metadata
Fields
Template:
BOCC
Date
6/25/2013
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Chair Signed
Document Relationships
2015-304-E Solid Waste - HDR Engineering Inc. of the Carolinas - Amendment to contract dated June 10, 2013 for the provision of professional services to the County
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
Agenda - 05-21-2013 - 5h
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 05-21-2013 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1.2 The Basic Services will be performed by the Consultant in accordance with the <br /> following schedule: (Insert task list and milestone dates) <br /> Task Milestone Date <br /> 1. Landfill gas system compliance n/a <br /> 2. Landfill closure/post closure compliance, <br /> permitting&capacity calculations n/a <br /> 3. Preparation of designs&bid documents n/a <br /> 4. Assistance in preparing scope of work <br /> requests for proposals n/a <br /> 5. Assistance with review of bid documents&proposals n/a <br /> 6. Preparation of drawings,.calculations, <br /> evaluations,estimates,assessments,etc. n/a <br /> 7. Waste characterizations,master plans& <br /> feasibility studies n/a <br /> 8. Drainage/erosion control plans n/a <br /> 9. Convenience Center design&permitting n/a <br /> 10.Other technical assistance as may be necessary n/a <br /> ARTICLE 4 DURATION OF SERVICES <br /> 4.1 Scheduling;of Services <br /> 4.1.1 The Commencement Date for the Consultant's Basic Services shall be June 10, <br /> 2013. <br /> ARTICLE 5 COMPENSATION <br /> 5.1 Compensation for Basic Services <br /> 5.1.1 Compensation for Basic Services shall include all compensation due the <br /> Consultant from the County for all services under this Agreement except for any authorized <br /> Reimbursable Expenses which are defined herein. <br /> 5.2 Reimbursable Expenses (Miry not be applicable to all Projects; cross out this <br /> section and do not submit ii ith RFP if not applicable.) <br /> 5.2.1 Reimbursable expenses are in addition to the fees for Basic Services and are for the <br /> following expenditures to the extent reasonable and actually incurred by the Consultant with <br /> respect to the Project: <br /> 5.2.2 Actual expenditures for postage, reproductions, photography, and long distance <br /> telephone charges directly attributable to this Project. <br /> 5.2.3 The actual cost of reproduction of reports, plans and specifications excluding <br /> documents for exclusive use by the Consultant. <br /> 5.2.4 The Consultant shall not be entitled to any mark-up on actual expenses which are <br /> incurred. <br /> Revised July 2010 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.