Browse
Search
Agenda - 02-23-1998 - C2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1998
>
Agenda - 02-23-1998
>
Agenda - 02-23-1998 - C2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2013 2:07:25 PM
Creation date
6/24/2013 2:07:17 PM
Metadata
Fields
Template:
BOCC
Date
2/23/1998
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C2
Document Relationships
Minutes - 19980223
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
026 08rierVAt)dns Associates,PA Post Office Box 12037 Durham 919/941-9000 <br /> Architecture/Engineering Research Triangle Park.NC 27709 Raleigh 919855 1ej2 <br /> Landscape Architecture/Planning Chapel Hill 919/96B-457- <br /> Interior Design <br /> OtBrienAtkins <br /> TO: Eddie Kirk, Orange County Planning Department <br /> FROM: Steven C. Russ, O'Brien/Atkins <br /> RE: State Employee's Credit Union- Oakdale Road at Old Hwy. 86 <br /> Statement of Sanitary Sewer Capacity <br /> DATE: February 9, 1998 <br /> Jim Blaine, SECU president, and I had separate phone conversations this <br /> morning with Thomas Hartye, Town of Hillsborough Engineer and Utilities <br /> Director, in which Mr. Hartye verbally assured us that Hillsborough has the <br /> sanitary sewer system capacity to support the Credit Union. He also says that the <br /> second paragraph of his April 21, 1997 letter to Liz King acknowledges that <br /> Hillsborough has sewer capacity available for the project. <br /> Jim Blaine and myself will submit engineered drawings of the sewer <br /> extension to the Town of Hillsborough for review and approval. We are eager to <br /> take the necessary steps to extend sewer to the project site. <br /> Sincerely, <br /> Steven C. Russ <br /> cc: Tom Hartye, PE, Town of Hillsborough <br /> Jim Blaine, SECU President <br /> Jay Smith, O'Brien Atkins <br />
The URL can be used to link to this page
Your browser does not support the video tag.