Browse
Search
Agenda - 01-21-1997 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 01-21-1997
>
Agenda - 01-21-1997 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2013 10:45:21 AM
Creation date
6/24/2013 10:40:12 AM
Metadata
Fields
Template:
BOCC
Date
1/21/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes - 19970121
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
RES-1997-001 Cable TV Rate Increase 01-21-1997-5a
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> Programming Costs <br /> Durham.System, NC-0276 <br /> Programming costs for the BST during 1997 are projected to be approximately$.3976 monthly,per <br /> subscriber. This compares to$3891 monthly, per subscriber,during 1996. Time Warner <br /> representatives state that program service providers customarily increase service fees annually. Time <br /> Warner attributes the bulk of its BST programming costs to copyright fees paid to the Copyright <br /> Royalty Tribunal, and fees for carriage of WGN, BET, Sneak Prevue, and Prevue Guide. The <br /> company did not claim any retransmission consent costs for either period. <br /> Programming costs for the Standard Service during 1997 are projected to be approximately$6.1195 <br /> monthly,per subscriber. This compares to$4.8473 monthly,per subscriber, during 1996. Included <br /> in this cost is the cable system upgrade cost,which amounts to$2.00 per subscriber,per month, in <br /> 1997. Time Warner is allowed to pass through this cost prior to the rebuild of the cable system, <br /> pursuant to the Social Contract between the company and the FCC. <br /> Programming Costs <br /> Carrboro System,NC-0256 <br /> Programming costs for the BST during 1997 are projected to be approximately$1606 monthly,per <br /> subscriber. This compares to 5.1626 monthly,per subscriber,during 1996. Time Warner attributes <br /> the bulk of its BST programming costs to copyright fees paid to the Copyright Royalty Tribunal,and <br /> fees for carriage of WGN. The company did not claim arty reh smission consent costs for either <br /> pro <br /> Programming costs for the Standard Service during 1997 are projected to be approximately$5.9857 <br /> monthly,per subscriber. This compares to$4.9203 monthly,per subsM iber,during 1996. Included <br /> in this cost is the cable system upgrade cost,which amounts to$2.00 per subscriber,per month,in <br /> 1997. Time Warner is allowed to pass through this cost prior to the rebuild of the cable system, <br /> pursuant to the Social Contract between the company and the FCC. <br /> The following tables itemize external cost elements included in Time Warner's January 1997 cable <br /> service rate inoess. Though the cable operator is permitted to charge the maximum permitted rate, <br /> it elected to lesser amounts. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.