Orange County NC Website
31 <br /> Road A and Road B' <br /> Default <br /> Percent of site traffic turning ** Allocation <br /> Right onto Road A %C289 25% MUST <br /> Left onto Road A %C290 25% <br /> Right onto Road B %E289 25% BE <br /> Left onto Road B %E290 25 % <br /> Total 100% 100% ENTERED <br /> j Road A,Road B,* and Road C*** <br /> Default <br /> Percent of site traffic turning *, Allocation <br /> Right onto Road A %C289 16.6% MUST <br /> Left onto Road A %C290 16.6% <br /> Right onto Road B %E289 16.6% <br /> Left onto Road B %E290 16.6% BE <br /> Right onto Road C %G289 16.6% <br /> Left onto Road C %G290 16.6% <br /> • Total 100% 100% ENTERED <br /> 50. For the region,what is the projected annual percent increase in the volume of <br /> traffic(average daily traffic [ADT])from the current year*—to the projection year'? <br /> Estimated regional annual percent increase in ADT % E291** <br /> If this information is not known,the regional percent increase in population will be used as a <br /> default indicator of traffic growth. <br /> 51. What is the level of service(LOS)in the community where the proposed <br /> development is located? (If this is unavailable,LOS D will be assumed.) [Enter either C,D,or E] <br /> LOS C E292 <br /> LOS D ENTER <br /> LOSE LETTER <br /> * Where applicable when a second road abuts the site. <br /> ** For percents,enter 25%as 25.0. <br /> *** Where applicable where three roads serve the site. <br /> **** Current year=time as of the filling out of the user worksheet. <br /> + Projection year=point in time in which the user wishes to examine development impacts(e.g.,project buildout,end of <br /> a stage of development,or any year over which development proceeds). <br /> 243 <br />