Browse
Search
Agenda - 01-16-1997 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 01-16-1997
>
Agenda - 01-16-1997 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2013 9:39:20 AM
Creation date
6/24/2013 9:39:10 AM
Metadata
Fields
Template:
BOCC
Date
1/16/1997
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 19970116
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> 30 <br /> 46. For each of these roads, what is the current Average Daily Traffic (ADT)? [Enter number of trips] <br /> Road A (average daily traffic) ADT C284* <br /> Road B** (average daily traffic) ADT E284 <br /> Road C`** (average daily traffic) ADT G284 <br /> 47. What is the length of the site frontage on each road? [Enter feet of frontage] <br /> Road A (site frontage) C285 feet <br /> Road Br*(site frontage) E285 feet <br /> Road C*** (site frontage) G285 feet <br /> 48. For each of the roads,what is the distance to the nearest intersection (in feet) as explained below? <br /> Road A Road B* Road C** <br /> Distance to the nearest <br /> intersection from the <br /> Right site boundary C286 feet E286 feet G286 feet <br /> (Right-most point of the site) <br /> Left site boundary C287 feet E287 feet G287 feet <br /> (Left-most point of the site) <br /> 49. For each of the roads,what is the estimated percent of the site traffic that will turn right or left? <br /> If this allocation is not known,the default allocation shown below should be entered. <br /> Road A Alone <br /> Default <br /> Percent of site traffic turning Allocation <br /> Right onto Road A %C289 50% MUST <br /> Left onto Road A %C290 50% BE <br /> Total 100% 100% ENTERED <br /> * A cell location(column and row identification)is provided for each response. <br /> ** Where applicable when a second road abuts the site. <br /> *** Where applicable where three roads serve the site. <br /> **** For percents,enter 25%as 25.0. <br /> 242 <br />
The URL can be used to link to this page
Your browser does not support the video tag.