Orange County NC Website
internal efforts are focused on trying to develop a way to manage this facility, and there are <br /> some operational issues to address. He said OCCC would need to provide a calendar of <br /> events. <br /> Commissioner Dorosin asked about the intent of the space, on Option A, at the bottom <br /> of the picture. He asked about the intended use of the 4 smaller rooms. <br /> Ken Redfoot said one of these would be the Board of County Commissioners pre- <br /> function area or conference room. He said the other three areas include a storage area; small <br /> conference rooms; and an office area for security. He said these are the same in Concept A <br /> and B. <br /> Commissioner Dorosin asked if Concept C is the same as Concept A with this area re- <br /> done. <br /> Ken Redfoot said this is Concept A re-done. He said Concept C takes a partition <br /> across the space and introduces more office areas, while making a permanent board room out <br /> of the remaining space. <br /> Commissioner Dorosin asked of the foyer area is in Concept A and C. <br /> Ken Redfoot said the foyer is no longer in Concept C, but there is still a pre-function <br /> area with straight access in to the room. <br /> Commissioner Dorosin asked if the stage area in Concept B takes the place of the <br /> permanent dais in Concept A <br /> Ken Redfoot said the dais would be on top of the stage. He referred to the map and <br /> designated the desk area for the Commissioners and the moveable seats beyond that. He <br /> said these desks would be in place for the meetings, and then an additional flexible stage <br /> would be put in front of this to make a larger space for performances. <br /> Commissioner Dorosin asked if the seating area is to be raised in all concept plans. <br /> Ken Redfoot said this is not decided, but that the plan is for the Board of County <br /> Commissioners seating to be raised on a dais in all plans. <br /> Frank Clifton said the dais would be raised so wiring and equipment could be <br /> underneath. He said that the intention, in the event that the facility is not used for public <br /> activities, was to maximize the building's potential use for other county offices. He said this is <br /> why meeting space shrinks in option C and office space increases. <br /> Commissioner Pelissier asked about the storage space and said it has been stated that <br /> some non-profits need storage. <br /> Frank Clifton pointed out a large storage area next to freight elevator. He said this area <br /> could store extra seating and stage components. He said this is only meant for limited <br /> storage, and any other storage space would need to be off site. <br /> Commissioner Price said there needs to be clarification on this issue because there are <br /> expectations about the storage. <br /> Frank Clifton said there is limited space and this is not designed as a permanent <br /> storage space. <br /> Commissioner Price said the Hillsborough Arts Council needs space to store large <br /> puppets each year during their public workshops. <br /> Chair Jacobs said there would need to be a system to police the storage areas. <br /> Commissioner Pelissier asked when the Board will see real pictures versus schematic <br /> designs to get a sense of what things will really look like. <br /> Jeff Thompson said the Board took tours in 2010 of various meeting locations and Ken <br /> Redfoot can make 3-d pictures or models. <br /> Ken Redfoot said this would be part of the further development of the plans down the <br /> line. He said more tours can also be done if needed. <br />