Orange County NC Website
98 <br /> IkMi��� 0BD�� �m ��o`ect ��evelop��e�t Scope of Work <br /> m�������m� ~ <br /> 7.0 Prepare 14r4� EIS (FEIS) arid llecord of Decision (ROD) <br /> 7.1. Prepare 1:TVS <br /> 7.1.1 Review PubHc and Agency Commnmemts <br /> Documentation of comments received from the public and from regulatory and resource agencies will <br /> be reviewed and a new chapter will be prepared and included in the FEIS that summarizes and responds <br /> to the comment made. <br /> DaUwanab|a: <br /> In No Deliverable <br /> 7.1.2 ReemaWate Impacts 1',lerDes[gmCbamgms SimceDEIS <br /> Impacts identified for the DE|S Preferred Alternative will be reevaluated per any design changes and as <br /> required from public and agency comments. <br /> Deliverable: <br /> in No deliverable <br /> 7'.I,3 Prepare FE::USErrata Sheets <br /> Errata sheets noting each edit to information included in the chapters of the DE|S will be prepared as <br /> needed for the FE|S. The errata sheets will address updates/changesto technical data presented in the <br /> chapters of the DE|S as required to reflect changes in the DE|3 Preferred Alternative. Resolution of <br /> proposed mitigation measures will be also be included in the FE|6. The FE|5 will build upon the work <br /> contained in the DEIS, incorporating comments and decisions made during the DE|Sreview. <br /> Deliverable: <br /> 0 FE|S Errata Sheets <br /> 7A.4 Pne�jpaire1PBS Documnemt <br /> The URSteamo will compile and edit errata sheets to be included in the Final Environmental Impact <br /> Statement (FE|S) document and prepare a review copy of FE|S for FTA review. Upon receipt of the FTA <br /> comments on the review copy of the FE|S, the document will be modified to incorporate appropriate <br /> requested changes. A letter to FTA will be drafted that lists all of their comments and hmm/ the team <br /> responded to those comments. After FTA comments have been incorporated and the FE|S has been <br /> revised, it will be distributed to agencies and made available to the public. The URS team will assist <br /> Triangle Transit in identifying the need to distribute the document to review agencies and others. The <br /> URS team will conduct document reproduction and will distribute electronic and hard copy versions of <br /> the FE|Son behalf of Triangle Transit and FTA. <br /> Deliverable: <br /> � FE|S (Draft and Final) <br />