Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
92 <br /> Naa fe R gi,01 n��l° d �� 5" �? 1`�+W,n+���"��� " Project e e IlI p e III t c o��)(.:.! of Work <br /> oupfnm""dP 'araaa,n <br /> 6.11-6 Stafloin Locat'lorr and Site SeIIect'iore"n <br /> Assist in the assessment, identification, and finalization of the LRT route alignment and the potential <br /> transit station facility and site locations. Prepare transit station location option maps and <br /> recommendations, as required. <br /> Deliverable: <br /> a Transit Station Location Option Maps <br /> &1.7 Station CoinceIcut S'nte Na ins and Sect'iorrs <br /> Prepare Concept Site Plans and Sections for each of the 17 proposed LRT station sites to illustrate the <br /> following: <br /> LRT station site location <br /> Conceptual station layout <br /> Station shelters and facilities <br /> Any required vertical circulation elements <br /> Site vehicular access and circulation <br /> Site pedestrian and bicyclist circulation <br /> Location of feeder bus bays <br /> Location of drop-off and pick-up areas <br /> Location and configuration of park-and-ride facilities <br /> Other special or unique station-related elements or features <br /> Deliverable: <br /> 1111111 Illustrative Plans for each of the 17 LRT Stations <br /> 6.1-8 Station Design Summary Report <br /> Prepare the Station Design Summary section for the DEIS Project Report that documents the following: <br /> Design Process and Approach <br /> Major Forces and Issues <br /> Key Design Parameters <br /> Recommended Station Concept Plans <br /> Station Sections and Other Support Material <br /> The text and graphics for the Station Design Summary Section will be provided in Word Document <br /> format. <br /> Deliverable: <br /> Station Design Summary Report <br /> DurharT-1-0rainge l,,.ight b all Transit Project � June 2013 1I 6-3 li;; 1RXI:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.