Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
90 <br /> ri��ngie Regional h a y s'ii/)oq r,�)' d Project OCR e v "III I iai 1rm t Scope of Work. <br /> our t:rfa'�°rd fri ur°r <br /> .0 Station Area Planning <br /> The following is a Work Plan for completing the Station Design Component for the Durham-Orange LRT <br /> (Light Rail Transit) Draft Environmental Impact Statement (DEIS). <br /> The project area for the Durham-Orange LRT corridor extends from Alston Avenue in Downtown <br /> Durham to the UNC campus in Chapel Hill. This work for the DEIS will use as a starting point the <br /> previously completed Alternatives Analysis (AA) for the corridor.The project is planned to include 17 at- <br /> grade or aerial LRT stations. <br /> The Work Plan identifies the steps for completing the concept design for the 17 LRT stations and <br /> provides a brief description of each task. <br /> 6.1 1,,,U T Station C ncelpt Design Develloprrrent <br /> 6-1.1 Reviiew Of Past Studies <br /> Review the AA documents and any other available studies and background material related to any past <br /> transit work and any other studies or design concepts related to the transit station areas. Identify key <br /> elements and findings relating to station design, as well as forces and issues that might impact the <br /> transit station development. <br /> Deliverable: <br /> 0 N/A <br /> 6.11..2 Study Area Base Maps <br /> Prepare study area base maps that can be used for the station area inventory, for identifying alternative <br /> corridor and station location options, and for preparing the station concept plans.The base maps will be <br /> developed from available aerial photography and other available material. <br /> Deliverable: <br /> RU Study Area Base Maps <br /> .1.3 Study Area lnveintory <br /> Conduct a visual and photo inventory of the station areas to document the existing conditions around <br /> the potential transit station locations.The inventory will address the following: <br /> K Physical characteristics of the existing environment <br /> Existing uses <br /> Existing traffic and circulation patterns <br /> Unique or distinguishing features or elements <br /> Deliverable: <br /> 10 Illustrative sections and other graphic materials, as requested <br /> Duiill°'narn-Oirange Light Rail l°`ransit Piroject: � .June 201„3 �6...1. DR AF i„ <br />
The URL can be used to link to this page
Your browser does not support the video tag.