Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
88 <br /> Project D e III Iljp n iiiv Scope f Work <br /> 51.0 Prepare DEIS Do r e rtt <br /> o�:3.1 Prepare IPirehinm'iinary DEIS <br /> The URS team will refine the various sections of the DEIS that have been produced as a result of relevant <br /> scope of work activities and will include preparation of an Executive Summary. These materials will be <br /> edited and refined to read as a complete document. Any missing sections, data or analysis will be <br /> completed here for inclusion in the revised draft document. The URS team will prepare a Preliminary <br /> Draft EIS (PDEIS) for Triangle Transit's review. The PDEIS will be revised as needed to reflect Triangle <br /> Transit's review and distributed to FTA for their review and comment. <br /> Deliverables: <br /> PDEIS for Triangle Transit Review. <br /> Revised PDEIS for FTA review and comment. <br /> 5.2 Prepare II"iinal Draft Enviironrnentalf Impact Staterent <br /> Upon receipt of the FTA comments on the Preliminary Draft EIS, the document will be modified to <br /> incorporate appropriate requested changes. A letter to FTA will be drafted that lists all of their <br /> comments and how the team responded to those comments. After FTA comments have been <br /> incorporated and the PDEIS has been revised to become the Final DEIS, it will be distributed and made <br /> available for public review and comment for the required 45-day circulation period. The URS team will <br /> assist Triangle Transit in identifying the locations where the document will be available for public review. <br /> The URS team will also assist Triangle Transit in identifying the need to distribute the document to <br /> review agencies and others. The URS team will conduct document reproduction and will distribute <br /> electronic and hard copy versions of the DEIS on behalf of Triangle Transit. <br /> Deliverable: <br /> In Final Draft Environmental Impact Statement (Vol. 1). <br /> 5.3 Prepare Pulbkc Noflce of Ava'ilabfflt (NOA) <br /> The Public Notice of Availability (NOA) notifies the public that a Draft EIS has been completed. The URS <br /> team will prepare the draft of the NOA and assist Triangle Transit with coordinating the placement of <br /> that Notice in the Federal Register with FTA. It is assumed that Triangle Transit will place appropriate <br /> advertisements announcing the public hearing(s) in local area newspapers. URS will conduct a QA review <br /> of the announcements prior to publications. <br /> Deliverable: <br /> IN Notice of Availability for the Federal Register and publication in newspapers (Draft and Final), <br /> 5.4 IMS CIA <br /> Prior to the submittal of the Preliminary DEIS (PDEIS) to Triangle Transit and FTA, the URS team will <br /> perform and independent quality review of the PDEIS. <br /> Ourhaini- ran ge Il.,.i lht lRail Transit Project � June 0:1.: 15-1 MRAFI„ <br />
The URL can be used to link to this page
Your browser does not support the video tag.