Orange County NC Website
86 <br /> n <br /> riangle Regional Pr o j e t 1".)evelollannent Scope of o r k <br /> 4.4.23 EvaWation of Xliernataves <br /> The URS team will develop the Evaluation of Alternatives Chapter of the DEIS based upon the analysis <br /> conducted in the relevant activities of this scope of work and the AA. The purpose of the evaluation <br /> process is to bring together the salient facts, both qualitative and quantitative, for each alternative so <br /> that their benefits, costs and environmental consequences can be evaluated against the stated goals <br /> and objectives for the project. <br /> The evaluation methodology compares the effectiveness of the alternatives in meeting the goals and <br /> objectives established for the project. All FTA criteria prescribed for major transit capital investment <br /> projects will be included. The evaluation also includes an assessment of the environmental justice and <br /> equity implications of the alternatives <br /> Deliverable: <br /> s DEIS Chapter on Evaluation of Alternatives(Draft and Final), <br /> 4.4.24 Environmental Impact Mitigation MeaSUres <br /> Based on the assessment of environmental impact and coordination with regulatory and resource <br /> agencies, mitigation measures will be identified to eliminate or reduce the impacts to an acceptable <br /> level. Potential mitigation measures will be identified during the DEIS section of the project. Detailed <br /> mitigation measures will be identified in conjunction with Preliminary Engineering. <br /> Deliverable: <br /> Impact Mitigation Measures Technical Memorandum for input to the DEIS (Draft and Final). <br /> Durhann-Orainge lI igkit: lRaH °t°irainslt; Piroject. J June 2.013 �4.-21 DRAFT <br />