Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
82 <br /> Trungte Reghn u � W , Project Development S c 'l��e Work <br /> mul��� �rtJ°4+N n <br /> horns or bells, and maintenance facilities.Vibration from the project would be generated by the light rail <br /> vehicle only. <br /> The study area includes hospitals, churches, residential areas and schools. The EIS will include a <br /> quantitative noise analysis that provides sufficient detail to determine impacts and the need for <br /> mitigation measures. A general vibration assessment will be conducted that incorporates geologic data, <br /> architectural components of vibration sensitive receptors and LRT vehicle and track data. If vibration <br /> impacts are anticipated, a detailed vibration analysis would then be conducted to determine the need <br /> for mitigation measures. <br /> The following steps are required for the noise and vibration analysis: <br /> Identify noise and vibration sensitive receptors <br /> Measure existing noise levels <br /> Develop General Noise Assessment Model <br /> Develop Detailed Nose Assessment Model <br /> Collect General Vibration data inputs <br /> Develop General Vibration Assessment Model <br /> Noise &Vibration QA/QC ITR (Acoustical Eng) <br /> Prepares Draft and Final Noise and Vibration Technical Memorandum Report/Comments <br /> Deliverables: <br /> Noise and Vibration Technical Memorandum, in accordance with the FTA 1995 guidance,Transit <br /> Noise and Vibration Impact Assessment (Draft and Final). <br /> DEIS Chapter on Noise and Vibration (Draft and Final). <br /> 4.4.1,6 I iazardous and Contary-flnatted IMaterWs <br /> This task will describe the potential for discovering contamination/hazardous materials in the Durham- <br /> Orange LRT Corridor and subsequent documentation in the EIS. For the LPA and alignment options, at a <br /> minimum, the URS team will: <br /> Identify Attempt to identify the presence of any known hazardous waste or contamination <br /> within areas to be affected by potential construction. <br /> For property to be acquired, assess the presence of environmental problems or contamination <br /> due to past or current practices or land use. <br /> List activities of other industries/commercial areas in the immediate area(s). <br /> Conduct searches of known contaminated sites adjacent to or on route of proposed project <br /> facility. <br /> Identify sites requiring further analysis. <br /> The URS team will identify properties along and adjacent to the potential project corridors where <br /> contamination may have been caused by past management, use, storage or disposal of hazardous <br /> materials. Identification of sites that may have hazardous soils will be completed using available records, <br /> Dunrhaii,°i...Orange III ight Rail 111,,.rainsit Project I June 201.3 X4.1. ' DlRAFIll' <br />
The URL can be used to link to this page
Your browser does not support the video tag.