Orange County NC Website
78 <br /> P r j(.c t (.„ Il O urri ion t Scope of O ir.�I� <br /> 4®4.7 Park I ands <br /> This task will identify all federal, state and city-owned parklands along the corridor and describe any <br /> impacts of the proposed alternatives on parklands. The description of parks will use the data gathered <br /> during the AA and will identify ownership, the types of recreation, and the park location in relation to <br /> the proposed alternatives. Any impacts to parklands, as a result of the project construction or service, <br /> will be documented. Where parkland resources are impacted, mitigation measures will be identified. If <br /> the project has the potential to use parklands, as defined by Section 4(f) of the Department of <br /> Transportation Act of 1966, a Section 4(f)Statement would be prepared. <br /> Deliverable: <br /> DEIS Chapter on Parklands (Draft and Final) <br /> 4.4u8 Section 4(f) IIrri oa vemeint <br /> The URS team will determine the Section 4(f) applicability of properties affected by the project <br /> alternatives including historic and archaeological sites, parks and recreation facilities and other areas, <br /> and if they determine that 4(f) resources are impacted, the URS team will evaluate the impacts to the <br /> Section 4(f) property. A Determination of Applicability (DOA) will be prepared for these sites for review <br /> approval by FTA. For the purposes of defining the scope of services, it is assumed that no 4(f) properties <br /> will be identified in the analysis. <br /> Deliverable: <br /> DEIS Chapter on Section 4(f) Involvement(Draft and Final). <br /> Section 4(f) Statement (contingent upon identifying impacts). <br /> 4.4n9 Safety and Security <br /> The URS team will provide an assessment of the potential impacts of the proposed project on the safety <br /> and security of the human environment, in support of the preparation of the DEIS. The task will describe <br /> the existing safety and security conditions at the proposed LRT station sites, identify any potential areas <br /> of concern for residents and transit patrons, and describe the proposed station area personal safety and <br /> security measures and pedestrian safety design techniques in and around the stations. <br /> Deliverable: <br /> DEIS Chapter on Safety and Security(Draft and Final). <br /> 4.4,10 Anallysis of Natura9 Resources <br /> This task will describe the environmental analyses necessary to conduct the preliminary evaluation of <br /> project alternatives. <br /> Physical Resources <br /> The Physical Resources section will be based on GIS data. The project study area physiographic region <br /> and topography will be described. Soil information will be based on SSURGO, and Prime Farmlands will <br /> be based on the U.S. Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS) <br /> soil surveys for Orange and Durham Counties. The project study area US Geological Survey (USGS) 8- <br /> digit Hydrologic Unit Code (HUC) and NCDWQ sub-basin will be identified. <br /> Durha:mrn Orainge Ill,,,ight IRaill Transit Project � June 201.3 J 4„,,1 DI RAF.”I. <br />