Orange County NC Website
72 <br /> frirrrrgle Regional 7 lom,,,a Pio,q�")M 0 Project [ e e I I rn ii � pl Of Work <br /> ow urit <br /> �d r"01 <br /> The simulation analysis and results will be prepared <br /> Maps showing the design hour traffic and measures of effectiveness <br /> Traffic Operations Results recap <br /> Grade Separation Analysis <br /> Complete a grade separation analysis for the existing year and future year proposed rail transit crossings <br /> for each of the major arterials using the results of the future year TRTDM travel demand model for the <br /> Baseline and Build alternatives. Analysis from the Draft Traffic Analysis Technical Report as well as <br /> results from the traffic simulations will be utilized to develop a list of locations. Analysis is expected to <br /> include: <br /> Two scenarios for each crossing; an at-grade scenario and a grade-separated scenario <br /> MOEs for each scenario including travel time and queue lengths <br /> Definition of basic benefits of each as well as negative impacts <br /> Compare and contrast each scenario <br /> w Basic cost difference between each alternative <br /> Deliverable: <br /> Grade Separation Analysis Technical Memorandum <br /> 43.4 Prepare Traffic Operations IResWts Report <br /> URS will prepare a traffic operations report based upon technical memorandums written as part of each <br /> sub-task that will document all work completed for this task. The report will include a review of existing <br /> conditions, data collected, traffic analysis in the existing and future years for the alternatives, the grade <br /> separation analysis, LRT simulation analysis, recommended traffic control devices for each crossing, <br /> recommended traffic plan for each station area, proposed improvements and conclusions, and general <br /> recommendations. <br /> Deliverables: <br /> A series of Technical Memoranda on the following: <br /> n Baseline Corridor Transportation and Traffic Conditions <br /> Forecast year intersection-turning movements <br /> Results of the traffic analysis for the alternatives suitable for inclusion in the <br /> Transportation Impacts section of the DEIS <br /> The simulation analysis and results will be prepared <br /> Maps showing the design hour traffic, existing year and future year, major intersection LOS for <br /> the AM and PM peak hours, for the Baseline and Build Alternatives <br /> Traffic Operations Results Report <br /> L urlhas -Or°ainge Light IRaH Trainsit Iliroject � .im,wine 203.3 J ..T IDRA11" <br />