Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70 <br /> lihingle i l ' 0'4'? uu0# Project � � l o� e rs t c O p e of Work <br /> lo � a � V uIC <br /> will be added. This network will then be reviewed to ensure that the proposed geometries match the <br /> best assumptions available. <br /> MOEs and traffic signal timings will be updated and added to the model. <br /> As with the base year no-build scenario, the previously created forecast data will be utilized as the <br /> starting point for developing the trip table for the two peak hours for each of the models. As with the <br /> base year no-build scenario,the trip tables will be set up in a path-based manner. <br /> The peak hour matrices will be imported into the updated interim year no-build model. The model will <br /> be run as many times as the base year was needed to achieve statistically significant calibration. Data <br /> from the simulation will be output and analyzed using an augmented form of the previously created <br /> spreadsheet tool. <br /> Deliverables: <br /> A series of micro-simulation models for each of the areas as needed for the interim year no- <br /> build scenario <br /> The simulation analysis and results will be prepared <br /> Maps showing the design hour traffic and measures of effectiveness <br /> IN Traffic Operations Results recap <br /> Interim Year Build Model Development <br /> A copy of the interim year build VisSim model will be created and to it all LRT projects will be added. This <br /> network will then be reviewed to ensure that the proposed geometries match the best assumptions <br /> available. <br /> MOEs and traffic signal timings will be updated and added to the model. <br /> As with the other scenarios, the previously created forecast data will be utilized as the starting point for <br /> developing the trip table for the two peak hours for each of the models. As with the other scenarios, the <br /> trip tables will be set up in a path based manner. <br /> The peak hour matrices will be imported into the updated future interim year build model. The model <br /> will be run as many times as the base year was needed to achieve statistically significant calibration. <br /> Data from the simulation will be output and analyzed using an augmented form of the previously <br /> created spreadsheet tool. <br /> Deliverables: <br /> A series of micro-simulation models for each of the areas as needed for the future year build <br /> scenario <br /> The simulation analysis and results will be prepared <br /> Maps showing the design hour traffic and measures of effectiveness <br /> Traffic Operations Results recap <br /> E. urlhar -Orainge L,iglht Ra 111 "Irainsiit Project I Jllurue 2013 �4-5 DRAi"'T <br />
The URL can be used to link to this page
Your browser does not support the video tag.