Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
68 <br /> `n <br /> Project De v III Ip iir ne iirt t Scope of r III( <br /> aur traan"'d' l'ud oar <br /> Traffic Data Collection <br /> The project team will review and assess the existing volume data. As base year and projected volumes <br /> exist for a number of locations, every effort will be taken to utilize existing data. No new count locations <br /> will be needed or are scoped as part of this process. <br /> As part of this process the project team will work with local stakeholders to determine what vehicle <br /> classification data is currently available and what additional data is needed. The project team will then <br /> work to create a data collection plan for finalizing any data needs during the field data collection phase. <br /> Assumptions for pedestrian flows and parking conditions identified in section 3.3.3 will be made at this <br /> point in time. Pedestrian flow information will be most critical in the downtown Durham area as within <br /> that location pedestrian interaction with vehicles could have the greatest impact on simulation results. <br /> Field Data Collection <br /> To complete the data collection process the project team, in coordination with the North Carolina <br /> Department of Transportation (NCDOT), will begin the process of collecting field data. This will include <br /> the following: <br /> 1110 A field visit <br /> Verification of geometry and signal plans <br /> Filming corridors for comparison to micro-simulation model runs <br /> Collecting and verifying speed limit data <br /> Collecting travel time data utilizing float car methodology for model validation <br /> Review of pedestrian and parking assumptions from previous step <br /> Collection of any further data identified in previous step <br /> This will complete the data collection phase of the project. No additional data needs are foreseen past <br /> this point. <br /> Process Data <br /> The first step in processing the volume data will be the revision of AM and PM peak hours volumes from <br /> any additional count locations that may have been collected by others such as NCDOT or DCHC MPO. <br /> Any new data will be processed similar to the forecasts created for the Draft Traffic Analysis Technical <br /> Report. <br /> The data will also be examined to determine the speed distributions seen at various places within the <br /> study area. Individual speeds will be categorized to determine how the traffic speeds vary. Data will also <br /> be analyzed to determine heavy vehicle percentages and vehicle fleet distribution.This data will then be <br /> compared against other similar data and finally entered into the VisSim models. <br /> Travel time data will be processed for use in validation of the micro-simulation models, <br /> Lastly, pedestrian and parking data gathered in the field will be reviewed against the assumptions made <br /> and adjustments will be made as needed. <br /> Durharn Orange Lliglht Rail rransit Project � June 2013 �4-3 IC RA11:1,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.