Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
67 <br /> Triangle Regional o's F'r of e c 11'.)eveloIxii-neint Scope of Work <br /> Downtown Durham — Focused along Pettigrew Street from Ninth Street/NC 147 to Alston <br /> Avenue. <br /> Erwin Road—Along Erwin Road from Fifteenth Street to Cameron Boulevard. <br /> South Square/University Drive—Starting at the Cornwallis Road Crossing and continuing through <br /> the University Drive area. It is anticipated that only the D3 alternative will be examined as it was <br /> selected as the LPA in an earlier phase. <br /> Gateway/Patterson Place Area — Beginning with the crossing of Garrett Road and continuing <br /> through Leigh Village. <br /> NC 54/Meadowmont Village Area — This sub-area will begin west of Leigh Village and continue <br /> through the Hamilton Station/Finley Golf Course Road crossing. It is assumed that two build <br /> scenarios will need to be developed; one for Alternative C1 and one for Alternative C2. <br /> Manning/UNC Chapel Hill Area —This will begin with the crossing of Old Mason Farm Road and <br /> continue through to the UNC Hospitals station. <br /> Base Year Model Data Collection <br /> The project team will collect data necessary to develop the VisSim micro-simulation models. This data <br /> will include, but is not necessarily limited to the following: <br /> * Aerial photography <br /> Contour data <br /> Traffic signal plans <br /> Relevant coordination plans <br /> All existing and relevant traffic counts <br /> Initial Base Year VisSim Model Data Development <br /> Coding of the VisSim model along appropriate sections of the corridor will begin by creating a base <br /> network over relevant aerial photography and contour data. The network will be verified initially and <br /> will be refined for what will be needed for the micro-simulation. This will include, but is not necessarily <br /> limited to the following: <br /> Coding of lanes and geometry <br /> Adding contour data <br /> Adding in traffic signals and subsequent timing and coordination plans <br /> Developing and coding measures of effectiveness (MOE's) <br /> Preforming a QA/QC check to ensure that data accurately matches base field conditions <br /> Once completed a geometrically accurate base year micro-simulation model will have been created.This <br /> model will at this point have no traffic data. <br /> Durlhaiuru-Or-ain e ll,,,'[glnt IRaH °I°uransiit Project O June 2013 J 4-2 DRAFT <br />
The URL can be used to link to this page
Your browser does not support the video tag.