Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
62 <br /> Project De v III IIN rn i t Scope of Work <br /> will be updated throughout the study process. In addition, visitors to the project website are able to add <br /> their contact information to the database. It is expected that the mailing list will include elected officials; <br /> transportation, environmental, civic, and business organizations; county, city, state, regional, and <br /> federal agencies; residents and property owners; transportation providers; the media; and other <br /> interested groups and individuals. To provide additional information dissemination, newsletters and fact <br /> sheets will be available at meetings and information repositories and could be distributed as seat drops <br /> and at stations. <br /> URS will work with Triangle Transit to develop and maintain a comprehensive database mailing list. URS <br /> will sort the master database for targeted mailings to a variety of groups including the corridor <br /> committees, elected and appointed federal, state, county, and local officials and the general public. <br /> Deliverable: <br /> Project database and mailing list input <br /> .6 Pulkihc lirivollvernent Meetings and Minutes <br /> A series of formal public meetings and hearing(s) will be conducted during the course of preliminary <br /> engineering phase and the DEIS and FEIS phases to offer opportunities to present project findings, <br /> discuss all alternatives considered during the process, and receive further public comment. The NEPA <br /> process sets forth clear requirements for public hearings, notice, and review/comment periods <br /> consistent with federal, state, and local requirements. <br /> Alternate public meeting formats, such as an open house format, will provide structured opportunities <br /> for informal interaction between the public and the project team at key points in project development. <br /> Public meetings can also leverage innovative and interactive technologies such as Twitter and Esri online <br /> to engage the public and aid in better understanding of the project. Such technologies will also allow for <br /> "24/7 public involvement" meaning that project understanding and comment can occur online outside <br /> of physical meetings. Three DEIS public workshops and two DEIS public hearings (one in Chapel Hill and <br /> one in Durham) as well as four station development workshops will be held in accordance with the <br /> project schedule publicized in the project scoping information booklet(May 2012). <br /> The URS team will prepare minutes for public, station workshop, and community outreach meetings, <br /> summarize all public comment, and have a court reporter to record and transcribe Public Hearings, <br /> including public input and response, for approval and distribution by Triangle Transit, attendance and <br /> preparation of meeting materials for the public hearings. <br /> Deliverable: <br /> M Agendas, meeting minutes of public meetings, hearings, open houses, and station workshops <br /> .7 Conduct IlR bUc Heaurliing(s) and Responses to Crou°nnrrients <br /> The URS team will assist Triangle Transit in preparing for the public hearing(s)for the DEIS. URS will work <br /> with Triangle Transit in making arrangements for the provision of the required court stenographer, <br /> securing the meeting room, and producing public hearing advertisements. The URS team activities will <br /> include assistance in the identification of meeting locations, meeting times, and other required logistics; <br /> preparation of handout and presentation materials for the public hearing(s); preparation of script for <br /> Durltiaim Orange ILigllhmt Dl allll Transit (Project � June 2.0111,' 1' - DRAFT <br />
The URL can be used to link to this page
Your browser does not support the video tag.