54 <br /> 14angle Re ion,al P r:� lr'310 000 Project I f,,.I IH Ip r nent Scope of Work <br /> Section 1 in this document summarizes the Work Plan proposed by the URS team to complete the <br /> design work that is essential to successfully construct the Triangle Transit Durham-Orange Light Rail <br /> Transit (D-O LRT) Project. <br /> ,1.0 Project Management <br /> 1.1 Project Management Control <br /> The task consists of the following activities: <br /> Monitor and manage contract deliverables and project costs. <br /> Prepare invoices, including progress reports for both Triangle Transit (monthly) and the Federal <br /> Transit Administration (FTA) quarterly reports. <br /> Attend project-related meetings as necessary with Triangle Transit and project stakeholder staff. <br /> Provide necessary information to support Project approval processes. <br /> Monitor Quality Assurance/Quality Control (QA/QC) procedures for design effort. <br /> Administer design subcontracts and Disadvantaged Business Enterprise (DBE) utilization. <br /> Conduct regular meetings with Triangle Transit and others to discuss project issues and <br /> progress. <br /> Develop meeting agendas and maintain a log of action items. <br /> IN Conduct technical meetings with Cities, NCDOT regulatory agencies, staff, and others as <br /> necessary to review basis of design and address specific technical issues. <br /> Conduct design review meetings as appropriate after interim design milestones. <br /> Conduct regular design coordination meeting with all design discipline leads to review and <br /> identify potential design issues, review design status in order to ensure a complete and <br /> integrated system design. <br /> Monitor progress of design deliverables and quality assurance. <br /> Attend public meetings as necessary to support Triangle Transit's efforts to address community <br /> issues and public involvement. <br /> Deliverables: <br /> Invoices, Monthly Progress Reports and progress of deliverables, and contract budgets <br /> Agendas, Meeting Minutes or Notes, Support Material, Action Item Logs <br /> 1.2 I?roject Scllhe 'ule <br /> Monitoring near term action times is the preferred method of tracking schedule and progress, <br /> which will include noting any required interfaces (predecessors and successors). <br /> When appropriate, develop a design and environmental baseline schedule of the project with <br /> the focus on those activities that will impact the critical path. <br /> um A construction schedule will also be developed near the conclusion of the engineering effort in <br /> support of the New Starts application. <br /> Durlhaur -Oi ange l,,,igl-t IR uIV T rarm it IPiroject I June 2013 �1-1 11..)RA,F l" <br />