Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> WHEREAS, both alignment options CI and C2 are potentially compatible with the overall <br /> Z:7 <br /> vision for the transit corridor; and <br /> WHEREAS, the ridership, costs, environmental impacts, community impacts, and impacts on <br /> nearby roadway traffic of alignment options C1 and C2 need to be further studied in the Scoping <br /> and Preliminary Engineering/Draft Environmental Impact Statement (PE/DEIS) phases before a <br /> final decision is made on whicli alignment should be advanced; and <br /> WHEREAS, alignment option D3 in the South Square station area would best promote transit- <br /> supportive economic development; and <br /> WHEREAS, the adoption of the Locally Preferred Alternative does not include a <br /> recommendation for the location of a Rail Operations and Maintenance Facility and the location <br /> of this facility will be further studied in the Scoping and PE/DEIS phases; and <br /> WHEREAS,, the adoption of the Locally Preferred Alternative will be followed by further study <br /> of the alignment and station locations, in the Scoping and PE/DEIS phases when a final decision <br /> is made on the remaining active options; and <br /> WHEREAS, the substantive issues identified in public comments on the Alternatives Analysis <br /> will be addressed in subsequent development steps such as Scoping and PE/DEIS. <br /> BE IT THEREFORE RESOLVED that the Durham-Chapel Hill-Carrboro Metropolitan <br /> Planning Organization Transportation Advisory Committee adopts light rail transit technology <br /> on the alignment reconuriended in the "Detailed Definition of Alternatives Technical Report" <br /> dated July 2011 with the modification,that both the CI and C2 options be carried forward for <br /> further study in the Meadommont and Hillmont station areas, with a preference for C2, as the <br /> Locally Preferred Alternative for the Durham-Orange County Corridor (as illustrated on the <br /> attached inap), and that the DCHC' NPO intends to incoi-porate this LPA into the forthcoming <br /> 2040 Long Range Transportation,Plan, provided here on this, the 8"' day of February, 2012. <br /> Lydia E. Lavelle, TAC Chair <br /> Durham County, North Carolina <br /> I certify that Lydia E. Lavelle Personally appeared before me this day acknowledging to me that <br /> she signed the forgoing document. <br /> Date: February 8, 2012 <br /> �AOTAP�, <br /> Frederick Brian Rhodes, Notary Public MY 0 <br /> ir <br /> My Commission expires: May 10, 2015 GOMUSMN EXRRES M <br /> - �'UBLIG INP <br /> "144f <br /> 4 COUVI <br /> 10;;111111,1�11,1100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.