Orange County NC Website
°0 V/1 127 <br /> Project Development Scope of Wor]k <br /> 9.14 �eims Befing Defeiriired to Nex,t ��Pt,lase <br /> The following scope items have been deferred to the next phase of engineering and are not considered <br /> critical to achieve reliable cost estimate. <br /> * Traffic Signal Design except ao defined in the Environment Impact Statement Scope mfWork <br /> * Complete traffic signing and pavement markings (some traffic striping will be shown for clarity, <br /> i.e. on Erwin Road. <br /> * Lighting in other areas other than discussed above. <br /> * 6treetscapeE|ennents <br /> * Pavement designs <br /> * Site Specific Signoge and VVoyfinding <br /> * Station access upgrades away from the immediate vicinity mf the station <br /> * Landscaping except ao indicated above <br /> * Fare Collection equipment specification <br /> * Light rail vehicle design and procurement documents <br /> � <br /> Public art <br /> � <br /> Phase ||environmental investigations <br /> Duirha00~Orange Ught Rail rransit lPr ^ect U June 2013 U9-18 DRAF]" <br />