Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
126 <br /> Wangle Regional goo Project DevOopmerit Scope of Work <br /> u'or <br /> tar° <br /> Assumptions <br /> The above scoping is predicated upon the following limitations. <br /> The URS Team will contact NC One-Call. The URS Team cannot be held responsible for utilities <br /> encountered but not marked by ONC One-call. The URS team will assemble existing utility as- <br /> builts and will also use the utilities locations obtained from our surveying efforts to ascertain if <br /> further utilities should be present than those marked.Timing of the work is critical in this regard <br /> should the need for the geotechnical data be earlier than the ability to completely check for un- <br /> marked utilities., <br /> The limits or heights of the retaining walls/noise walls, the layout of the columns for the aerial <br /> structures, and the layout of the components for the LRT stations were not available at the time <br /> of this scoping and fee preparation. The scoping and fee estimate was only based upon the <br /> conceptual plans and profile drawings, and therefore, is subject to change when more detailed <br /> plans are available. <br /> It should be noted that sampling and testing requirements are a function of the subsurface <br /> conditions encountered. The cost estimate assumes that adequate bearing materials will be <br /> encountered within reasonable boring depths, consistent with this area/geologic region and <br /> past experience. Should conditions be encountered which require deepening of the borings or <br /> additional exploration. Notification will be provided to discuss modifying the outlined scope of <br /> services. <br /> Reasonable precautions will be taken to minimize damage to the Project Site from URS' <br /> activities and use of equipment in the field. The client recognizes that the performance of the <br /> services included in this Agreement may cause alteration or damage to the site. Client accepts <br /> the fact that this is inherent in the work and will not look to The URS Team for reimbursement <br /> or hold The URS Team liable or responsible for any such alteration or damage. <br /> .114 Ei n ineeirin $IaecW Stud'ies <br /> Special studies will be performed as directed by Triangle Transit pursuant to the allotment of hours <br /> indicated on the task and drawing control log.An allowance has been made for both Wake and Durham- <br /> Orange special studies. A safety and security review of stations, park and ride lots, TPSS sites, parking <br /> garages, and the ROMF will also be a special study undertaken. <br /> 9.115 Agreement with TMird Parties <br /> The URS Team will assist Triangle Transit with agreements with third parties. A list of third party <br /> agreements has been defined in the September 2012 New Starts report application. <br /> Durham Orange lI,Jg ht RaH rrarssit; F"Ir ject � .iuine 201 � .,47 DR AF I' <br />
The URL can be used to link to this page
Your browser does not support the video tag.