123 <br /> fm <br /> r <br /> Triangle egI,onal Project Developrrient Scope f WO r III <br /> a vrg.m o�is i fta, '°u re <br /> All supplemental surveys will be incorporated into the project base mapping. <br /> Property Surveys <br /> Courthouse Records Research <br /> The URS Team will perform research of records, plans, deeds and plats of record to obtain <br /> all property, easement and right of way descriptions possible. <br /> Field Property Ties and Recon <br /> The URS Team will field locate property corners and other evidence of boundary lines, <br /> easements and rights of way within the corridor. <br /> Property Analysis and Computations <br /> U The URS Team will map the property lines, easements and rights of way within the corridor <br /> utilizing the records and deeds obtained along with the surveyed property corners. <br /> Deliverable: <br /> in Complete survey base mapping plans presented in layers of information for use by the <br /> engineering disciplines. <br /> 9.112 Subsurface Utillity Engiineedng <br /> SUE—Level B(Designation) <br /> The URS Team will field verify and identify underground utilities within the project corridor. The URS <br /> Team will then contact and meet with representatives of the utility companies operating facilities within <br /> the affected project area and collect copies of utility records. The URS Team will then employ <br /> geophysical prospecting techniques to determine the existence and horizontal position of underground <br /> utilities. These techniques will include: Electromagnetic Location and Ground Penetrating Radar (GPR) <br /> scans. Once found the utilities will then be marked on the ground using the universally recognized <br /> industry standard system of paint markings at a minimum of 50 foot intervals along the utility and at <br /> bends in the line. Once the utilities have been marked the URS Team will locate by field survey methods <br /> all paint marks designated in the task above.The URS Team will then map the location of the subsurface <br /> utilities and integrate the mapping into the planimetric data. <br /> SUE—Pole Data and Classification <br /> The URS Team will collect the location and attribute data for 1500 poles. This data will include pole <br /> condition, utilities attached to the pole, pole owners and pole stamp information. Once the data has <br /> been collected the URS Team will prepare a utility pole matrix that contains all the data and the final <br /> locations of each pole. <br /> SUE—Level A(Soft Dig—Pot-holing)40 Holes <br /> In order to provide three dimensional locations of any areas of conflict identified by the client, the URS <br /> Team will obtain horizontal and vertical positions of target utility lines by excavating test holes at <br /> specific locations as directed by the client. Any excavation by the URS Team at this level is performed <br /> with the use of a nondestructive Vacuum Excavation truck, to eliminate any damage to the utility. Once <br /> the target utility has been uncovered, the URS Team will use conventional survey methods to locate the <br /> utility and prepare utility test-hole reports for all required test holes. <br /> I)urhanrn.,,Orainge Ili,.uight IRad 'III"raunsit Fliroli1ect 1I Juine 2013 �9 14 1DRAF'r <br />