Orange County NC Website
121 <br /> J <br /> rr xi ngle Regiati i ,,W Project [)evelopment Scope of Work <br /> The yard site will include track and OCS layouts, service aisles, cross sections, grading and drainage <br /> plans, lighting plans, site provisions for train wash, maintenance of way building, and a traction power <br /> substation. To the extent that the yard acreage can accommodate a complete runaround track will be <br /> provided to allow for flexibility of yard operations and for turning of vehicles for operations on the <br /> mainline. <br /> 9�13 Support Services <br /> The paragraphs that follow describe the support services that will be performed. <br /> 9.1.3.1. Surveying <br /> Some of the surveying has already begun on the project including the aerial photography and scanning. <br /> The scope is included herein for reference.The surveying tasks consist of the following: <br /> Property Owner Notifications <br /> The URS Team will utilize the county GIS database to obtain the names and address of all <br /> property owners within the survey corridor. <br /> The URS Team will prepare a form letter that provides some general information about the <br /> project and informs the property owners that during this phase of the project, surveyors, <br /> engineers, or other personnel will be accessing their property to perform surveys and other <br /> investigations on their property. <br /> The URS Team will mail the property owner notification letters to the address obtained via USPS <br /> Registered mail with signature acknowledging receipt. <br /> The URS Team will attempt to contact by phone or in person those property owners whose <br /> notification letters are returned undelivered. <br /> Establish a GPS control network along the project corridor. <br /> The URS Team will utilize existing NCGS monuments near the project corridor along with <br /> strategically placed new monument "pairs" set every mile to mile and a half along the project <br /> corridor. GPS observations will be performed on each monument to establish a GPS control <br /> network. <br /> " The control network will serve as the basis of control for the aerial photography (Item 3) as well <br /> as conventional baseline control run between the new"pairs" (Item 5). <br /> " The control network will be tied horizontally to the NAD 83(2011) datum and vertically to the <br /> NGVD 1988 datum allowing mapping from other sources such as FEMA, county GIS databases, <br /> etc.,to be incorporated accurately. <br /> Aerial Mapping Control <br /> The URS Team will place and or collect the horizontal and vertical location of approximately 100 target <br /> panels or photo ID points. The coordinates and elevations of these target panels or photo ID points will <br /> be provided to the Aerial Mapping sub-consultant and utilized for controlling and rectifying the aerial <br /> imagery. <br /> IDurhan -Orange Light IRaH °IFrainsit Project June 2013 19-12 DRAFT <br />