Orange County NC Website
120 <br /> Ti aikgins egiouaf ,�t'!J ns''a Pir")yrlm Project De 'e Il opIV"f'i e III" t Scope of Work <br /> Technical Train Control Report <br /> 9.1.2 RalH Operafl ns and Niaintenance Far.'ifty <br /> Based on the preferred rail operations and maintenance facility (ROMF), the URS Team will perform the <br /> following subtasks: <br /> 9.1.2.11. Prograirnu=nnling of fll°we Facility <br /> The URS Team will coordinate the facilities and equipment to be provided for in the maintenance <br /> building with Triangle Transit regarding the initial build out of the facility versus functions that can be <br /> added later. The programming report will determine space requirements and room configurations and <br /> will consider best practices of industrial engineering in regards to which areas and rooms are adjacent to <br /> which. The report will also address the size and expandability of the facility based on current ridership <br /> and potential build-out of the system. <br /> Deliverable: <br /> Maintenance Building Programming Document <br /> 9.12.2 MaMteinance lI3uildiurng nmclhlil:ecfu4 and i:ngiuneering INains <br /> Preliminary architectural and engineering plans will be produced based on the programming of the <br /> facility and also based on the yard layout. This includes preliminary plans for architectural treatments, <br /> floor plans, elevations, sections and enlarged area details; structural plans; mechanical equipment <br /> layout plans, plumbing, fire protection plans, and energy calculations; electrical plans including one line <br /> diagrams, equipment elevations, grounding plans, lighting, power, luminaire schedules and control <br /> diagrams. <br /> 9.1123 Train Wash Facwll'ity <br /> The URS Team will locate a train wash facility within the maintenance storage yard and identify <br /> equipment and the facilities that will be needed to support the facility including water reclamation, oil <br /> and water separation facilities, and utility services. Preliminary engineering plans consisting of a plan <br /> view, elevation, and sections will be developed. <br /> 9,12.4 IINUntenance of Way BuHdiing <br /> The URS Team will define size, design and locate a Maintenance of Way building and the functions and <br /> equipment that will be assumed to be in the building based on policy discussion with Triangle Transit. <br /> The facility is expected to be approximately 10,000 square feet for the initial system. Expandability will <br /> be taken into account. Selected preliminary engineering plans, similar to those defined in Section 9.12.2, <br /> will be developed. <br /> Deliverable: <br /> Maintenance of Way Programming Document <br /> 9.12.5 Maiirnteriaunce Storage Yard <br /> The yard tracks will be designed to accommodate the fleet size and expansion requirements, which will <br /> be discussed with Triangle Transit and as yard space allows depending on the ultimate preferred site. <br /> E.)ur lharri....f" range Light Ra'ill °f.m"ainsit Project � fw«uine '21.01 � .1.1 D1f AF7 <br />