Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
118 <br /> iang e Regh mal Project lf', e III o m III° k <br /> 9.1.0.2 1R T Corridor IRS*t wining WaHs <br /> Structural design of the LRT corridor retaining walls and sound walls will be performed. Sections and <br /> tables will be presented. <br /> 9.10.3 Ii%edestdan IRiridges <br /> The URS team will perform structural design with the 2 pedestrian bridges as discussed in Section 9.9.1. <br /> 9.1.1. Systenris Engineering <br /> Develop an LRT electrical and communications systems design to meet the operational <br /> performance goals. <br /> 9.11.1 Traction Powerr <br /> It is assumed that pre-packaged substations will be used. If there is an architectural treatment to be <br /> applied, it is assumed to be the same for all substations. The architectural design will be handled via <br /> graphics. In addition, the URS team will do the following: <br /> Perform traction power Load Flow Simulation models for the proposed traction power system. <br /> Determine locations and rating of substations and coordinate with site plans. <br /> Coordinate with the utility companies to locate and design the electrical service connections. <br /> Prepare substation typical equipment layout which will also serve to size the structure. <br /> IN Develop site plans showing the arrangement of the substations within its immediate area and in <br /> relation to the property being used. Utility service will also be included on the site plans. <br /> Single line diagrams will be prepared in accordance with the design criteria. <br /> Deliverable: <br /> N Traction Power Load Flow Simulation Model/Substation Location Report <br /> 9.11.2 OCS Plans <br /> It is assumed that dual wire, high and low profile OCS system will be designed except for Erwin Road. <br /> Erwin Road will be assumed to be wireless or be a single wire system. <br /> Decide on preliminary pole locations and produce OCS layout plans. <br /> Coordinate OCS design with traction power substation and appropriate sectioning. <br /> Coordinate the OCS and Power System design with consideration of future additional expansion <br /> at each terminus <br /> 9 11.3 Signalhng <br /> The signaling design will be coordinated with the grade crossing designs and traffic signal designs. Single <br /> line track/signal layout plans will be produced along with signal cable plans and signal route and aspect <br /> plans and schematics.This includes the following: <br /> NR': Coordinate with traffic signal designers to establish train-to-wayside communication systems for <br /> any necessary train signal integrated into the traffic control design. <br /> IDUrlhar -Orarige Il...igll-it IRaill Turainsit I1::)roject � June 203.3 19 9 IIDR Fr <br />
The URL can be used to link to this page
Your browser does not support the video tag.