Orange County NC Website
116 <br /> iiauPr� te Regional hvlasii�,Pdo F'roject Developrnent Scope of Work <br /> IN Coordinate roadway re-grading design in coordination with track profile. <br /> Identify proposed drainage improvements associated with the roadway modifications and <br /> reconstruction. <br /> Complete all necessary civil modifications including sidewalks, ADA upgrades and curb-return <br /> modifications in addition to the placement of all fixed facilities. <br /> Review road grading designs with each authority having jurisdiction. <br /> 9.8 Station Platforim, Canolpies, Bins Canopies and iriforrnationai Mosk <br /> A major assumption of the scope of work is to limit the presentation of station and station platform <br /> canopy designs to two basic designs for the at-grade stations. The same will be true for <br /> kiosk/information displays. This assumption is based on having a single station layout and design for the <br /> stations within the Town of Chapel Hill and another for the stations within the City of Durham, although <br /> this could be altered to specific stations regardless of jurisdiction. The elevated stations at UNC and <br /> South Square will be presented separately and may have their own unique design given the magnitude <br /> of the station and structure. If the Friday Center station is elevated, then it is assumed that it will have <br /> the same design as the UNC station design. Side platform or split platform station designs will also have <br /> their own unique canopy arrangements. <br /> The scope of work includes: <br /> Develop a shelter design concept of appropriate scale, materials <br /> (maintenance/durability/constructability) and functionality (weather protection, ADA <br /> compliance). <br /> Coordinate the relocation of existing bus stop amenities as appropriate. <br /> Make accommodations for pedestrian and bicycle movements through and around the light rail <br /> station and bus stops as necessary. <br /> Develop shelter structural and foundation design and preliminary plans and coordinate the <br /> integration with civil design. <br /> Coordinate with Triangle Transit. City and stakeholders to integrate any unique paving elements <br /> into platforms. <br /> Ensure integration of all systems required for a fully-functional station (i.e. power, <br /> communications, lighting, and fare collection). <br /> Coordinate with Triangle Transit and stakeholders to develop/identify stop furnishing elements <br /> including railings, windscreens, seating and trash receptacles. Consistency in furnishing layouts <br /> at the stations will be inherent in the design. <br /> Coordinate with Triangle Transit and stakeholders to develop/identify type, size and location <br /> (TSL)of information kiosk/Station ID/real time information display. <br /> Deliverable: <br /> Graphic architectural designs for use with the Public Involvement Program and meetings. <br /> Durlharn-Oranf,e Ugll°it Rail T'rairis'it IV'roject � June 2013 �9-7 DR AF <br />