Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
116 <br /> iiauPr� te Regional hvlasii�,Pdo F'roject Developrnent Scope of Work <br /> IN Coordinate roadway re-grading design in coordination with track profile. <br /> Identify proposed drainage improvements associated with the roadway modifications and <br /> reconstruction. <br /> Complete all necessary civil modifications including sidewalks, ADA upgrades and curb-return <br /> modifications in addition to the placement of all fixed facilities. <br /> Review road grading designs with each authority having jurisdiction. <br /> 9.8 Station Platforim, Canolpies, Bins Canopies and iriforrnationai Mosk <br /> A major assumption of the scope of work is to limit the presentation of station and station platform <br /> canopy designs to two basic designs for the at-grade stations. The same will be true for <br /> kiosk/information displays. This assumption is based on having a single station layout and design for the <br /> stations within the Town of Chapel Hill and another for the stations within the City of Durham, although <br /> this could be altered to specific stations regardless of jurisdiction. The elevated stations at UNC and <br /> South Square will be presented separately and may have their own unique design given the magnitude <br /> of the station and structure. If the Friday Center station is elevated, then it is assumed that it will have <br /> the same design as the UNC station design. Side platform or split platform station designs will also have <br /> their own unique canopy arrangements. <br /> The scope of work includes: <br /> Develop a shelter design concept of appropriate scale, materials <br /> (maintenance/durability/constructability) and functionality (weather protection, ADA <br /> compliance). <br /> Coordinate the relocation of existing bus stop amenities as appropriate. <br /> Make accommodations for pedestrian and bicycle movements through and around the light rail <br /> station and bus stops as necessary. <br /> Develop shelter structural and foundation design and preliminary plans and coordinate the <br /> integration with civil design. <br /> Coordinate with Triangle Transit. City and stakeholders to integrate any unique paving elements <br /> into platforms. <br /> Ensure integration of all systems required for a fully-functional station (i.e. power, <br /> communications, lighting, and fare collection). <br /> Coordinate with Triangle Transit and stakeholders to develop/identify stop furnishing elements <br /> including railings, windscreens, seating and trash receptacles. Consistency in furnishing layouts <br /> at the stations will be inherent in the design. <br /> Coordinate with Triangle Transit and stakeholders to develop/identify type, size and location <br /> (TSL)of information kiosk/Station ID/real time information display. <br /> Deliverable: <br /> Graphic architectural designs for use with the Public Involvement Program and meetings. <br /> Durlharn-Oranf,e Ugll°it Rail T'rairis'it IV'roject � June 2013 �9-7 DR AF <br />
The URL can be used to link to this page
Your browser does not support the video tag.