Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
114 <br /> our tf l� t 1,, r oJ e c t D e v e II o Ip irn e in t S c o,p'e of VV'o Ir k <br /> where necessary in order to provide an estimation of drainage quantities. Quantities will be indicated <br /> directly on the plans. <br /> The watershed and classification of all streams will be determined and verified on environmental- <br /> sensitivity base maps, and the applicability of any stormwater regulations will be determined. The <br /> potential for impact will be determined by considering the proximity of the discharge point to the <br /> receiving stream, and the ratio of new impervious surface area to total watershed area. <br /> Recommendations for potential BMP preventive and control measures to minimize the impacts will be <br /> documented. These measures may include, grassed swales, vegetative filter strips, preformed scour <br /> holes, infiltration basins, detention and/or retention basins. <br /> Deliverable: <br /> Drainage and Hydrology Report <br /> 9,6.5 Erosion Contr6l Plans <br /> Erosion control concepts will be developed and documented on plan sheets to determine additional <br /> temporary construction easement needs and to determine estimation of quantities. <br /> .6.6 Corer°idor UtHitlies IR&Iocation IINans and Piroffts (as needed) <br /> The URS Team will: <br /> Prepare a formal list of utility contacts. <br /> Coordinate with surveyor and utility owners to identify existing utilities within the affected ROW <br /> and to establish a composite utility base map for the project. <br /> Meet with utility representatives to establish utility relocation guidelines. <br /> le Identify those utilities that need to be relocated or modified in place. <br /> Identify those utilities that will be relocated or modified in place by others. <br /> Identify any reasonable solutions to resolve potential utility conflicts with protective measures. <br /> Develop preliminary designs for public water and sanitary sewer utility relocations and/or <br /> modifications. <br /> Develop preliminary plans showing the limits of private utility relocations and/or modifications <br /> to be designed by others. <br /> Deliverables: <br /> Utility relocation report documenting the affected utilities, ownership and disposition in <br /> addition to the plans set. <br /> IN Preliminary utility drawings as described above. <br /> .63 11 emoHdon 1Plans <br /> Demolition plans will be prepared to show the intended extent of the required demolition and to serve <br /> for cost estimating purposes. <br /> Durllhmarn-Orange ll i lht Ilfla 111 Tirarns'it Project � June e ,D .3 � -5 Dl°Al,1" <br />
The URL can be used to link to this page
Your browser does not support the video tag.