Orange County NC Website
113 <br /> Hangle egi na ��n��������'���P„������� �� Project IIC v O0pIin iin Scope of Work <br /> Field and Office Data Collection: A field reconnaissance visit to the project will be conducted to verify <br /> existing drainage structures and features, identify land use, and define surface drainage flow patterns. <br /> During this visit each drainage outfall will be located, described, and evaluated for any stability, and or <br /> capacity concerns. <br /> As appropriate for the project, local resident and/or DOT and City maintenance personnel will be <br /> interviewed to determine the presence of recurring drainage problems, and to determine historical high <br /> water information. Potential environmental impacts, such as fill in wetlands or stream relocation, will be <br /> noted. For major drainage structures that exist within the project limits, research will be conducted to <br /> obtain previous bridge/culvert survey reports, bridge inspection reports and scour studies. Flood zone <br /> status will be determined and stream gage data will be obtained if applicable. <br /> Bridge and Box Culvert Size Structures: Preliminary review indicates that there will be approximately <br /> fourteen bridge or box culvert (structures with a conveyance greater than a 72' pipe) size crossings. <br /> Hydrologic and Hydraulic analysis of these structures will be performed to determine size, location and <br /> hydraulic performance. Bridge scour analysis will be performed on the bridge structures for use in <br /> determining foundation cost. Designs will be documented in plan and profile and in the detailed <br /> drainage report. Nine of these sites are located in FEMA Designated Flood Hazard Zones. Existing FEMA <br /> models will be obtained from the North Carolina Floodplain Mapping Program (NCFMP). These existing <br /> models will be used to insure designs meet FEMA regulations and to determine the possible FEMA <br /> approvals that will need to be obtained prior to construction. This information will be documented in <br /> the detailed drainage report. <br /> The following Streams are located in FEMA Designated Flood Hazard Zones: <br /> Stream Name AA Plan Sheet Approx. Station Potential Structure Study Type/DFIRM <br /> Meeting of the Water B-02 65+00 Culv. Extension Limited Detailed 9788 <br /> Chapel Creek B-03 96+00 Culv. Extension Limited Detailed 9798 <br /> Little Creek C1-04 120+00 Bridge Limited Detailed 708 <br /> New Hope Creek D-06 357+00 Bridge Redelinated 800 <br /> Sandy Creek D-07 363+00 Bridge Redelinated 800 <br /> Sandy Creek D-08 380+00&384+00 Bridge Redelinated 800 <br /> Sandy Creek E-01 113+00 to 133+00 Culvert Redelinated 811 <br /> Sandy Creek Trib E-01 122+00 RT Culvert Redelinated 811 <br /> Sandy Creek E-02 172+00 Culvert(? ) Redelinated 811 <br /> Un-named Trib. C1-01 40+50 Culvert No Study <br /> Un-named Trib. D-02 231+00 Culvert No Study <br /> Un-named Trib. D-03 242+00 Culvert No Study <br /> Un-named Trib. D3-03 95+25 Culvert No Study <br /> Un-named Trib. E-04 191+50 Culvert No Study <br /> Pipes,Storm Drain Ditches and Stormwater Management Various analyses will be performed and will <br /> include cross pipe analysis and design, closed storm drainage system design modifications to existing <br /> systems, underdrain design, ditch and channel capacity analysis and stability recommendations, outlet <br /> energy dissipater design, and stormwater best management practice (BMP) design. Appropriate output <br /> files and reports will be generated and included in the Detailed Drainage Report. Conceptual drainage <br /> designs will also be provided for the Yard & Site, and provisions will be made for the drainage for the <br /> eight park and ride lots. All proposed drainage design will be documented in plan sheets and profiles <br /> Durlhnarn Orange I,,.ligllhnt Il ailll Transit (Project � June 2013. �9..4 DIRAF.F <br />