Orange County NC Website
111 <br /> Wangle flr io al f � Project Dev loprnerit Scope Work ir(�P <br /> from other agencies and customize to the Durham-Orange Project and to the policies and practices of <br /> Triangle Transit. <br /> Deliverable: <br /> III Draft and LRT Final Design Criteria <br /> 9.4 Cost Estimating Quantities <br /> Each design discipline will be responsible to assemble material quantities based on the preliminary <br /> designs. These quantities will be developed using standard anticipated pay items for the unit involved. <br /> Back-up calculations will be developed and checked. <br /> Deliverables: <br /> Quantities for cost estimating purposes <br /> Back up calculations <br /> 9.5 New Risk, AnMysls <br /> The URS team will perform a new risk analysis near the end of the preliminary engineering for input into <br /> the updated new starts application for the request to enter the engineering phase. The URS team will <br /> update the Risk Management Control Plan as necessary to reflect the added detail associated with <br /> preliminary engineering. <br /> Deliverables: <br /> Risk Analysis Management Control Plan Update <br /> New Risk Analysis <br /> 9.6 Civd, Engineering,­ HIT Corridor <br /> The product for all of the engineering disciplines (sections 9.6 through 9.11) that follow will include the <br /> drawings as discussed and will not be repeated under the deliverables for the sake of duplication. <br /> Special reports will be noted. <br /> 9.6.1 General Drawings <br /> General drawings will be prepared including drawing indexes, project location plan, key sheet indexes, <br /> survey control monumentation plans. As part of this effort, a Regulatory Review and Permit Report will <br /> be prepared. <br /> Deliverable: <br /> III Regulatory Review and Permit Report <br /> 9.602 Mgnrnent If1ain and (Profile, Sections and Details <br /> The URS Team will: <br /> Finalize the alignment scenarios for the US 15-501 study area working with local stakeholders <br /> for definition of up to two alternatives. <br /> Durham-Orange E.igllnt Rad Transit (Project M June 2013 �9- , DRAFT <br />