Orange County NC Website
110 <br /> N <br /> F <br /> PrOri'wgle� ' ! "�� rW "i'�'"S� 1 ,�rr� P�Y o� ;; m t Developi-rient Scope Ilf <br /> 9.0 F)iirehrninairy I ngiiiirmeering IDesiign <br /> URS's Work Plan is to complete the preliminary engineering designs for all appropriate design elements <br /> to successfully baseline the definition of the Triangle Transit D-O LRT Project and to advance cost <br /> estimating accuracy for budgeting purposes. <br /> 9a1„ QAJ'C C Prograin,i <br /> Prepare QA/QC project management plan for the URS Team of consultants derived from URS' <br /> Quality Management System (URS QMS)which conforms to the requirements of ISO 9001:2008. <br /> Assure the completeness and accuracy of contract deliverables through three primary checks: <br /> • Detail Check <br /> • Discipline Coordination Review <br /> • Independent Technical Review <br /> • Document quality reviews and compliance with corrective actions. <br /> Conduct internal audits to assure adherence to the quality procedures. <br /> Deliverables: <br /> 1111111 Quality Management Plan <br /> IN Documented QA/QC Reviews and Audits of compliance (upon request) <br /> 9.2 Design Managemerit and Co ri: inafllori <br /> Provide direction to the design discipline team, <br /> Attend project coordination and project progress meetings, <br /> Participate in design review meetings at major design submittal milestone. <br /> Participate in follow-up meetings as necessary to resolve outstanding design issues. <br /> Track design review comments and the disposition of the response by the responsible designers. <br /> Incorporate appropriate comments into design documents as appropriate. <br /> As appropriate, conduct meetings to review basis of design assumptions in advance of design <br /> submittals in effort to streamline the review process. <br /> Perform special studies as needed. <br /> Deliverables: <br /> Design Action Item logs per Design Progress Meetings <br /> IN Design review comment tracking list(s) <br /> Special Studies as needed <br /> 9.3 Design Criteria [DevelVopirrment <br /> The URS Team will develop a Light Rail Design Criteria for the project.These criteria will be applicable for <br /> future light rail projects and extensions. The URS Team will make use of published up to date criteria <br /> Di.uurltia°urn Orange Ligllnt: RaH Tra, inslit Project � June 2013 J 9-1 DRAF1,,, <br />