Browse
Search
Agenda - 06-18-2013 - 7f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:55:43 AM
Creation date
6/17/2013 1:01:29 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7f
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
106 <br /> Triangle, Regional 1 mrir ;�,,n �� <br /> �f r o j e c De III m i.I t Scope of Work <br /> owir t.�a n si, , irat ure <br /> For each scenario, URS team will code inputs, apply the model, and supply the raw forecast trip <br /> tables and loaded networks to URS for post-processing to traffic impacts. <br /> URS team will prepare tabulations of raw model outputs and necessary modeling-related text <br /> submissions for use in the assembly of the DEIS. <br /> URS team has made allowance to attend weekly project teleconferences with the project team. <br /> Deliverables: <br /> Tabulation of ridership estimates for each alternative. <br /> " Ridership Results technical memo in support of DEIS. <br /> 8.7 travel 1--orecastiin ctiivuiti s (Entrance into Engiirieeriwuig IIC EIS) <br /> 53.1 °I`oox l i.a1lad :es/Ulriceirt ldnty and Sensith4ty An°4�yMs <br /> Comments received on the DEIS, including from FTA, will be considered in making adjustments to the <br /> project forecasting tool and to inform further uncertainty and sensitivity analyses. As part of this task, <br /> URS Team will run the STOPS "national model" to provide reference forecast information that may be <br /> used in the New Starts submittal. <br /> Deliverable: <br /> in Documentation suitable for informing project stakeholders and inclusion in FEIS documents will <br /> be prepared. <br /> 8.71 Finai Mternativ:n II',;;.vallu:.tia um <br /> To the extent that changed forecasts are required, this task provides an allowance to make updates to <br /> the DEIS work in the FEIS. The budget does not provide for a complete repeat of the DEIS analysis, but <br /> does provide for two or three additional model runs to enable preparation of the final EIS documents. <br /> For each scenario so analyzed, CS will code inputs, apply the model, and supply the raw forecast trip <br /> tables and loaded networks to URS for post-processing to traffic impacts as with the DEIS evaluation <br /> subtask. CS will prepare tabulations of raw model outputs for use in the assembly of the FEIS. CS will <br /> update validation and methodology reporting and documentation as necessary based on Subtask 1.2.1. <br /> Deliverable: <br /> Final Alternatives Evaluation <br /> 8.7.3 Preparatloin of New Starrts Sulburniittal <br /> In this task, URS Team will assemble the required inputs to the New Starts submittal requesting entry <br /> into Engineering. It is assumed that supplemental ad hoc reporting will be developed from the model to <br /> inform the development of the submission. This task provides resources to permit the STOPS "national <br /> model" results or the HIS analysis results to be used in preparing the submission. <br /> Deliverables: <br /> Tabulation of ridership estimates for each alternative. <br /> Ridership results technical memo in support of New Starts submission„ <br /> D u urlhar n Orange ILiglht lRaill "'Frrairnsit Ilirour ject �I .Juirie 2013 J 8-7 IIDFIAII F <br />
The URL can be used to link to this page
Your browser does not support the video tag.