Orange County NC Website
104 <br /> Trhmgle Re iom, t t �""fi�7l I����,����"''I�7y � Project e n m :u ro of Work <br /> asst O'aan"ol ji�,�anOVO <br /> Deliverables: <br /> Updated PMP <br /> Updated subplans and PMP appendices <br /> 85 DI°°Y 2.01.6 Update IPirroject IManageorneiunt Man and Sulbpllans <br /> The URS team will work with Triangle Transit to review, revise, and update the Durham-Orange Light Rail <br /> Project Management Plan (PMP) and its subplans/appendices. The PMP and subplans/appendices were <br /> developed to be living documents which should be reviewed and updated as the project progresses to <br /> ensure that the PMP continues to meet the changing needs of the project and accurately reflects how <br /> the project is being managed. On an annual basis, the URS team and Triangle Transit will review and <br /> update as necessary the PMP and subplans. <br /> The table above reflects the subplans or appendices to the PMP that will be reviewed on an annual basis <br /> and updated as necessary. <br /> Deliverable: <br /> FY 2016 Updated PMP (Draft and Final) <br /> 8.5.1 RaH Transit Operating and Maintenance Procedures (TOMP) IReport <br /> As the project progresses, it is appropriate to begin to define anticipated rail operations and <br /> maintenance procedures. The Transit Operations and Maintenance Procedures (TOMP) Report will <br /> identify those procedures. The TOMP will be a living document which will be updated as the project <br /> progresses through Engineering and into construction. <br /> Deliverable: <br /> TOMP (Draft and Final) <br /> 8.1.5.2 Update Raill Flleet Maintenance Nain <br /> FTA requires all agencies to have fleet maintenance plans (FMP) in place. An initial Rail FMP was <br /> prepared in the fall 2012. This plan will require updating based on revised service plan assumptions <br /> resulting from the above tasks. <br /> Deliverable: <br /> N Updated Rail Fleet Maintenance Plan <br /> 8,53 Upadate Docuirneint Control Man <br /> URS Team will also perform an annual review of the document control system in FY 2015 and <br /> incorporate changes to the Document Control Plan and Document Control procedures as required. <br /> Anticipated Duration:July 2014—June 2015 <br /> Deliverables: <br /> Updated PMP <br /> Updated subplans and PMP appendices <br /> Durrlll°iaurn Orange il,,,iglht Rail Transit Project I June 2013 �g,,.'5 IDII II1::T <br />