Browse
Search
Agenda - 06-18-2013 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:51:25 AM
Creation date
6/17/2013 10:07:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
2013-195 AMS - MBAJ Architects Inc for NHSC Architrectural and Engineering Design/Construction $173,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />ORANGE COUNTY <br />HEALTH DEPARTMENT <br />Improving health. Inspiring change. <br />1 1 <br />To: Michael Talbert <br />CC: Jeff Thompson <br />From: Tom Konsler <br />Date: April 15, 2012 <br />Re: Water and Sewer Capacity at Northern Human Services Center <br />5800 NC 86 N Hillsborough <br />I am providing an update on the water and sewer capacity for Northern Human Services Center <br />in anticipation of the work session on April 16th. <br />Water System — The current well on the property is classified as a non - transient, non - <br />community public water supply by the state. It has retained this classification because until <br />recently, there was a daycare center in the facility. Now that the daycare is no longer in <br />operation, the county will seek a reclassification as a transient non - community water supply. <br />This will considerably reduce operating costs as there are fewer testing and monitoring <br />requirements. <br />The capacity of the well should not be a problem for considering anticipated uses for the <br />facility. The wastewater system will be the key limiting factor in overall capacity and the well <br />could produce the quantity needed up to the septic system capacity. <br />Existing Wastewater System - The existing wastewater system is designed for up to 2400 <br />gallons per day (GPD) of use. With the decrease in use of the facility building itself, some of this <br />flow (up to 1000 GPD) was allotted to the bathrooms at the ballfield picnic shelter which is now <br />also connected to the septic system. This leaves approximately 1400 GPD wasteflow capacity <br />available for the building. <br />Without knowing the potential usage for the building (childcare, offices, meeting space, food - <br />service, etc.) it is difficult to put limits on the variety of options. Once potential usage types are <br />identified, it would be relatively simple to find the capacities in terms of number of people, <br />919 245 2360 131 west Margaret lane, Suite 100 tr Chapel Hill, NC 27514 orangecountync.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.