Browse
Search
Agenda - 06-18-2013 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:51:25 AM
Creation date
6/17/2013 10:07:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
2013-195 AMS - MBAJ Architects Inc for NHSC Architrectural and Engineering Design/Construction $173,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northern Human Services Center Schematic Budget Comparison <br />Notes: <br />1. Per FY2012 -13 CIP Budget <br />2. Contingency is 20% at schematic budget phase. <br />3. Option based on FY10 -11 CIP Northern Center refurbishment submitted in February 2010. <br />Contemplates removing classroom wings and maintaining remaining structure, foundation, exterior walls. <br />Also includes new windows, new roof, new mechanical, electrical, and plumbing systems. <br />Contemplates similar upfit allowance to options 1 and 2 as well as furniture /equipment to suit desired space plan. <br />All options contemplate a component of the project memorializing the historical significance of the original site and its use. <br />•. <br />RE <br />Option 1 <br />Option 2 <br />Option 3' <br />New Construction, <br />New Construction, <br />Removal of classroom wings, <br />10,000 SF pre- <br />10,000 SF of similar <br />adaptive re -use of 10,000 SF <br />engineered building, <br />design to existing <br />center portion <br />standing seam roof, <br />masonry construction <br />masonry and /or block <br />accented exterior walls <br />Abatement, Removal' <br />$250,000 <br />$250,000 <br />$250,000 <br />Design, Construction, Equipment <br />$1,401,760 <br />$1,974,000 <br />$1,427,218 <br />Contingency2 <br />$280,352 <br />$394,800 <br />$285,444 <br />Schematic Budget <br />$1,932,113 <br />$2,618,800 <br />$1,962,662 <br />Budget per square foot <br />$193 <br />$262 <br />$196 <br />- sustainable bldg <br />- sustainable bldg <br />orientation, future <br />orientation, future <br />sustainable <br />sustainable <br />- adaptive re -use's captured <br />Considerations: <br />Infrastructure <br />Infrastructure <br />energy <br />-more design control <br />-more design control <br />- higher costs <br />-fewer unforeseen <br />-fewer unforeseen <br />- greater unforeseen <br />conditions <br />conditions <br />conditions <br />- requires re -work of existing <br />wastewater treatment <br />system <br />Notes: <br />1. Per FY2012 -13 CIP Budget <br />2. Contingency is 20% at schematic budget phase. <br />3. Option based on FY10 -11 CIP Northern Center refurbishment submitted in February 2010. <br />Contemplates removing classroom wings and maintaining remaining structure, foundation, exterior walls. <br />Also includes new windows, new roof, new mechanical, electrical, and plumbing systems. <br />Contemplates similar upfit allowance to options 1 and 2 as well as furniture /equipment to suit desired space plan. <br />All options contemplate a component of the project memorializing the historical significance of the original site and its use. <br />•. <br />RE <br />
The URL can be used to link to this page
Your browser does not support the video tag.